Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-UTL-0324-00529
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/22/2024 | Engineering Project Managers | REQUIRES RESUBMIT | - The gas line will be crossing UGE a couple of times, but there are no dips shown in the proposed gas line profile. There will be conflicts in between. - The gas line will be very close to our proposed signal power meter and controller at Frost. Suggest they dip gas line in the area so that the installation of our signal conduit and signal equipment will not be problematic. - In addition, has the water main proposed by Escalara been installed between Frost Dr and Escalara driveway? Based on the plans we got from them, the water main will be crossing the proposed gas line a couple of times too and will be in conflict. |
||
03/22/2024 | ROW Engineering Review | REQUIRES RESUBMIT | See DTM project manager's comments about utility clearances | ||
03/19/2024 | Transportation Application Review | REVIEW COMPLETED |