Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-ROW-1125-01432
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/08/2025 | Engineering Project Managers - Standard | PENDING ASSIGNMENT | |||
| 12/02/2025 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | Review Notes: 1) 5th St is currently under Prop 101 Construction project Coordination with Traffic Control and work required and under review (Pg 1) 2) Major intersections need to show accurate ROW depiction for all direction of travel (Pg 1) 3) Review work locations as some referenced manhole are located on lane lines, PG 1 & 3) 4) If Left turns are restricted Detour route should be called out/ (PG 1) 5) Message boards should be provided for long scope work areas. 6) 10' Minimum Lanes to be maintained at all times. (Pg 3) 7) Review deign vs Existing ROW configuration (pg 3) |
||
| 11/24/2025 | Transportation Application Review Express | REVIEW COMPLETED |