Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TR-ROW-1125-01432
Parcel: 12606317A

Review Status: Requires Resubmit

Review Details: RIGHT-OF-WAY REVIEW v.1

Permit Number - TR-ROW-1125-01432
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/08/2025 Engineering Project Managers - Standard PENDING ASSIGNMENT
12/02/2025 ROW Engineering Review - Standard REQUIRES RESUBMIT Review Notes:
1) 5th St is currently under Prop 101 Construction project Coordination with Traffic Control and work required and under review (Pg 1)
2) Major intersections need to show accurate ROW depiction for all direction of travel (Pg 1)
3) Review work locations as some referenced manhole are located on lane lines, PG 1 & 3)
4) If Left turns are restricted Detour route should be called out/ (PG 1)
5) Message boards should be provided for long scope work areas.
6) 10' Minimum Lanes to be maintained at all times. (Pg 3)
7) Review deign vs Existing ROW configuration (pg 3)
11/24/2025 Transportation Application Review Express REVIEW COMPLETED