Permit: TR-ROW-1125-01432
Permit Details
Apply Date:
11/21/2025
Applicant:
Andres Amado
Description:
Traffic control needed in COT ROW to access Tucson waters 54in PCCP main that is in the southbound lane of Columbus BLVD. 24 hour delineation is required to stage equipment to allow us to carbon fiber repair pipes internally through manhole access. construction activities only during working hours.
Permit Reviews
Permit Number - TR-ROW-1125-01432
Permit Status: Complete
Permit Description: Traffic control needed in COT ROW to access Tucson waters 54in PCCP main that is in the southbound lane of Columbus BLVD. 24 hour delineation is required to stage equipment to allow us to carbon fiber repair pipes internally through manhole access. construction activities only during working hours.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/10/2025 | RIGHT-OF-WAY REVIEW v.2 | 12/10/2025 | APPROVED |
| 11/21/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/08/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-1125-01432
Permit Status: Complete
Permit Description: Traffic control needed in COT ROW to access Tucson waters 54in PCCP main that is in the southbound lane of Columbus BLVD. 24 hour delineation is required to stage equipment to allow us to carbon fiber repair pipes internally through manhole access. construction activities only during working hours.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 11/24/2025 | The following extended traffic control set-up times were approved: |
| 11/24/2025 | PRE-CON/SIDEWALK |
| 11/24/2025 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
| 12/10/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1125-01432
Permit Description: Traffic control needed in COT ROW to access Tucson waters 54in PCCP main that is in the southbound lane of Columbus BLVD. 24 hour delineation is required to stage equipment to allow us to carbon fiber repair pipes internally through manhole access. construction activities only during working hours.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 03/11/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/11/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 03/11/2026 | TRSP - ROW - Final | Passed |