Permit Review Detail
Review Status: Approved
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-ROW-1025-01296
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/30/2025 | ROW Engineering Review - Standard | APPROVED | E 4th St is under Pavement Moratorium *New individual service line connections and individual service line repairs may be made in new pavements without a moratorium patch requirement provided the backfill and pavement repair includes NO native backfill and the pavement area affected is less than 4-ft wide to complete the T-Top Patch Detail. If the width exceeds the 4-ft maximum width, the area of patch must comply with moratorium patch requirements. Where cuts to pavement under moratorium occur due to an emergency, Utilities may follow the non-moratorium pavement repair requirements described above in lieu of the requirements in section 10.3.2. |
||
| 10/22/2025 | Transportation Application Review Express | REVIEW COMPLETED |