Permit: TR-ROW-1025-01296
Permit Details
Apply Date:
10/21/2025
Applicant:
Andrew Ruiz
Description:
remove/replace 180SF of asphalt (1) 4" sewer tap on 8: VCP (1) 40LF of 4" SDR 35 sewer pipe from sewer line to 5' inside of property FULL CLOSURE
Permit Reviews
Permit Number - TR-ROW-1025-01296
Permit Status: Complete
Permit Description: remove/replace 180SF of asphalt
(1) 4" sewer tap on 8: VCP
(1) 40LF of 4" SDR 35 sewer pipe from sewer line to 5' inside of property
FULL CLOSURE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/30/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1025-01296
Permit Status: Complete
Permit Description: remove/replace 180SF of asphalt
(1) 4" sewer tap on 8: VCP
(1) 40LF of 4" SDR 35 sewer pipe from sewer line to 5' inside of property
FULL CLOSURE
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 10/22/2025 | The following extended traffic control set-up times were approved: |
| 10/22/2025 | CITY ROW vs PRIVATE PROPERTY |
| 10/22/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 10/30/2025 | E. 4th St is subject to a pavement moratorium. A 2-inch mill and overlay, covering half the width of the roadway, is required. The ROW inspector will confirm the treatment required for pavement restoration at the preconstruction meeting |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-1025-01296
Permite Description: remove/replace 180SF of asphalt
(1) 4" sewer tap on 8: VCP
(1) 40LF of 4" SDR 35 sewer pipe from sewer line to 5' inside of property
FULL CLOSURE
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/25/2025 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Deferred |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1025-01296
Permit Description: remove/replace 180SF of asphalt
(1) 4" sewer tap on 8: VCP
(1) 40LF of 4" SDR 35 sewer pipe from sewer line to 5' inside of property
FULL CLOSURE
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/25/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 11/25/2025 | TRSP - ROW - Final | Passed |