Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.3
Permit Number - TR-ROW-0825-01006
Review Name: RIGHT-OF-WAY REVIEW v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/27/2026 | Transportation Application Review Express | PENDING ASSIGNMENT | |||
| 06/03/2026 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | Site Plan Catch Basin Connection Detail does not provide the Flexible pipe being utilized, RCP is DTM's requiered material in Public ROW. Flexible pipe connections to concrete catch basins have had issues. The pipe be 18" RCP |