Permit Review Detail
Review Status: In Review
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-ROW-0726-00816
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| N/A | Storm to Shade Review | PENDING ASSIGNMENT | |||
| 07/24/2026 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | DTM Review Comments - Traffic Control Plan 1) Show all driveway or side streets located with in the closure area 2) Note Street Parking located along both Sides of ROW along with Residential Access 3)Call out and Address Sidewalk impact with Trench crossing sidewalk 4) Call out Work Hours and Number of Work Day Closure is in place Design Plan. 5) Call out and Show Full Trench Dimensions 6) Callout Total Square Yardage of Pavement Cut with Asphalt |
||
| 07/16/2026 | Transportation Application Review Express | REVIEW COMPLETED |