Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-ROW-0326-00343
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/01/2026 | MITZ District - Standard | PENDING ASSIGNMENT | |||
| 04/01/2026 | Transportation PIO - Standard | PENDING ASSIGNMENT | |||
| 03/31/2026 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | DTM Comments on Proposed Documents 1) Design rendering show Truck Usage of Bus Lane for Truck Entry? Is Traffic Control plan intended to match this proposed scope of work ? Or will Truck be entering off the WB Right Lane for turn in to site? Is Bus Lane being closed for clear zone during demo? Will Pedestrian sidewalk access be impacted by this proposed closure? TCP Comments : 1) No Travel Lanes effected why is Speed reduction being placed. Will there be traffic conflicts 2) Bike to be provided access are within TC closure on ROW with Posted SL above 30 mph. MDI Speedway Document - Overlay not matching up to base Aerial layer with in Document. Provide Document Clarity. |
||
| 04/01/2026 | Sun Tran Review - Standard | REVIEW COMPLETED | I have spoken with the Project Manager and have agreed to move the bus stop at a later time. | ||
| 03/25/2026 | Transportation Application Review Express | REVIEW COMPLETED |