Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
1815 E SPEEDWAY BL
Apply Date:
03/24/2026
Applicant:
Aman Sekhon
Description:
Barricade for site demo, Temporary relocation of bus stop, closure of bike lane associated with Speedway & Campbell Development

Permit Reviews

Permit Number - TR-ROW-0326-00343
Permit Status: Complete
Permit Description: Barricade for site demo, Temporary relocation of bus stop, closure of bike lane associated with Speedway & Campbell Development
Start Date Submittal Complete Date Status  
03/24/2026 RIGHT-OF-WAY REVIEW v.1 04/01/2026 REQUIRES RESUBMIT Review Details
04/06/2026 RIGHT-OF-WAY REVIEW v.2 04/09/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0326-00343
Permit Status: Complete
Permit Description: Barricade for site demo, Temporary relocation of bus stop, closure of bike lane associated with Speedway & Campbell Development
Total Outstanding Activity Conditions - 6
Date Name
03/25/2026 The following extended traffic control set-up times were approved:
03/25/2026 Bus Stop/Route
04/06/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
04/06/2026 Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
04/06/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
04/06/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ROW-0326-00343
Permite Description: Barricade for site demo, Temporary relocation of bus stop, closure of bike lane associated with Speedway & Campbell Development
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/10/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Deferred OK to set up according to approved TC Plan.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0326-00343
Permit Description: Barricade for site demo, Temporary relocation of bus stop, closure of bike lane associated with Speedway & Campbell Development
Total Completed Inspections - 2
Date Description Inspector Results Comments
04/14/2026 TRSP - ROW - Barricade - Setup/Routine Passed
06/12/2026 TRSP - ROW - Final Passed Barricades have been removed for this location

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
SPEEDWAY DEMO LOGISTICS RENDERING.JPG_V2.PDF DOCUMENTS VIEW
TCP REVISED_V2.PDF DOCUMENTS VIEW