Plan Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT OF WAY REVIEW v.1
Plan Number - TR-FTTP-1126-00047
Review Name: RIGHT OF WAY REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| ROW Engineering Review Standard | REQUIRES RESUBMIT | Please revise design plan to verify: 1. Manhole locations. From image given, it is unclear where the manholes are (in the road or behind curb) 2. When I spoke with EZ Barricade, they said the time frame is 5-10 minutes at each location. ***THIS INFO IS IMPORTANT because if work can be done within 8 hours, and is not in the road/ , this work can be done under the ANNUAL MAINTENANCE PEMIT, but if the location of the manholes are in the roadway at all, then traffic control would be needed and *** OTHER REVIEW NOTES for consideration: RTA One #32: Houghton Road Reconstruct began 11/1/26- Tanque Verde Rd to I10 is a 6-lane divided asphalt roadway, a new 3-lane northbound bridge over the Pantano Wash, retaining walls, new traffic signals, new water transmission mains, dark skies roadway lighting, new cross drainage structures, dedicated turn lanes, bus bays, bike lanes each side, an asphalt MUP, ADA compliant concrete sidewalk, public, native plant landscaping and water harvesting |
|||
| Transportation Application Review Express | REVIEW COMPLETED |