Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: TP-PRE-1026-00209
Parcel: 122130660

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE ENTITLEMENTS REVIEW v.1

Plan Number - TP-PRE-1026-00209
Review Name: PRE-APPLICATION CONFERENCE ENTITLEMENTS REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Entitlements * REVIEW COMPLETED REZONING/SPECIAL EXCEPTION
PRESUBMITTAL PREAPPLICATION REVIEW


DATE: 11/4/2026
REVIEWED BY: Gabriel Sleighter, Lead Planner
CASE NUMBER: TP-PRE-1026-00209, TEP Substation Expansion
PROJECT ADDRESSES: 1230 N ALVERNON WAY
PARCEL NUMBERS: 122-13-065C, 122-13-0660
EXISTING ZONING: C-1, R-1
EXISTING USE: Utilities Distribution, Vacant
PROPOSED USE: Expansion of existing substation

PROJECT DESCRIPTION & LOCATION:
This application is similar to a previous pre-application for a substation expansion at this site, and many of the comments for that pre-application meeting are relevant here. Those comments may be found at:

https://pro.tucsonaz.gov/plandetails/TP-PRE-0124-00021/

The applicant has submitted a presubmittal request for special exception procedure for a Zoning Examiner Special Exception to expand an existing TEP substation on Alvernon Way across the parcel to the east, facing Mabel Street. The development site is 1230 N Alvernon Way, at the intersection of Alvernon Way and Mabel Road.

APPLICANT NAME: LEXY WELLOTT, THE PLANNING CENTER
E-MAIL: LWELLOTT@AZPLANNINGCENTER.COM

PLAN DIRECTION

ADOPTED PLAN (S): PLAN TUCSON, ARROYO CHICO AREA PLAN

PLAN AMENDMENT REQUIRED BASED ON CONCEPT PRESENTED (SEE NOTES BELOW)

0 YES 1 NO 0 TO BE CONFIRMED LATER
NOTE: THE NORTHSIDE PLAN DOES NOT SUPPORT THE 3 STORIES ON THE NORTHERN PARCELS

PLAN SUPPORT BASED ON CONCEPT PRESENTED (SEE NOTES BELOW):

0 YES 0 NO 1 WILL DEPEND ON DESIGN





 

Surrounding Zoning and Land Uses: The west parcel on the project site is zoned C-1 and is currently a TEP substation. The second parcel, currently vacant, is zoned R-2 and is directly adjacent to a duplex managed by Housing and Community Development as affordable housing. Uses north and south of the existing substation are commercial and face Alvernon Way to the west.

Analysis:
This is the second pre-application submittal for this project – the applicant has made the requested changes to the landscaping plan and sidewalk based on feedback previously received by the Design Review Board for this expansion.

Utilities Distribution land use in an R-1 requires a Zoning Examiner Special Exception Procedure (UDC 3.4.3) prior to issuance of a development package and building permit, and development must comply with use-specific-standards 4.9.11.A.1, .2, .5, .8, .9, .11, and .12.

The substation expansion as depicted on the preliminary development plan does not comply with above use-specific standards. The site is directly abutting residential land use and proposes locating a 12-foot wall directly against the backyard areas of the duplex to the east.

The need for enhanced energy infrastructure is understandable as we collectively move towards a more electrified and renewables-based energy mix, and that this need may come into conflict with existing neighborhoods and land use codes.

The Board of Adjustments can vary use-specific standards when that variance is approved as a condition for Special Exception Land Use, and support for this proposal may be conditional upon that variance being granted after the Zoning Examiner rules on the case.

A plan amendment is not required.


ADDITIONAL NOTES:
Fire New Construction * REVIEW COMPLETED TP-PRE-1026-00209 • Pre-Application Conference Entitlements Review v1 • 1230 N ALVERNON WY TUCSON, AZ 85712:
Based on the information provided, TFD has no comments at this time.
Questions: patricia.shelton@tucsonaz.gov / 520.837.7082
ROW Engineering Review * REVIEW COMPLETED New driveways shall be constructed per COT SD 206. Existing West entrance is very close to existing fire hydrant, minimum distance between driveway and fire hydrant is 20 feet, relocate if possible.
New 5' sidewalk require along street frontage on Mabel St.
Site Engineering * REVIEW COMPLETED 1. The western edge of the site encroaches into the Alvernon Wash floodplain limits, at the development package phase a floodplain use permit will be required for the proposed work in the floodplain.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
Site Landscape * REVIEW COMPLETED PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, PLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: ZONING EXAMINER SPECIAL EXCEPTION FOR A PROPOSED EXPANSION AND REPLACEMENT OF THE EXISTING SUBSTATION
ACTIVITY NO: TP-PRE-1026-00209
ADDRESS: 1230 N ALVERNON WY
ZONING: COMMERCIAL ZONE (C-1)
LAND USE PER UDC TABLE 7.6.4-1: UTILITY SERVICE EXPANSION AND EQUIPMENT REPLACEMENT
10.27.2026

THE COMMENTS PROVIDED ARE PRELIMINARY AND ARE NOT TO BE ASSUMED AS A COMPLETE REVIEW OF THE PROPOSAL. DURING THE DEVELOPMENT PACKAGE REVIEW PROCESS, A FULL REVIEW WILL BE MADE BY THE SITE LANDSCAPE/NPPO REVIEW SECTION TO ENSURE COMPLIANCE WITH THE APPLICABLE CITY OF TUCSON UNIFIED DEVELOPMENT CODE, TECHNICAL STANDARDS MANUAL AND ADMINISTRATIVE MANUAL REQUIREMENTS FOR SITE LANDSCAPE, NATIVE PLANTS AND RAINWATER HARVESTING.

SITE LANDSCAPE/NPPO COMMENTS:

1. This is a utility service expansion to the east. The east property boundary is adjacent to a Residence Zone. The utility service land use adjacent to a residence zone requires a minimum 6-foot masonry wall along its entire length. The PDP proposed a 12-foot wall to match the existing wall at the western parcel. THIS WALL APPLICATION IS APPROPRIATE FOR THE USE AND MEETS AND/OR EXCEEDS THE STANDARDS SET FORTH ON UDC TABLE 7.6.4-1.

2. This site does not include a building expansion. It is an expansion of land area for additional substation equipment and the proposed landscape planting and rainwater harvesting areas provided on the PDP are appropriate applications for this site expansion and replacement of equipment. THE ONLY ADDITIONAL REQUEST WOULD BE TO ADD A FEW ADDITIONAL TREES THAT WOULD CONFORM WITH UDC 7.6 STREET LANDSCAPE BORDER TREES AT 1 TREE PER 33 LINEAR FEET OF PROPERTY STREET FRONTAGE. THE TEXAS OLIVE TREE IS SHOWN ON THE PLANTING LEGEND BUT NOT INCLUDED AS PART OF THE LANDSCAPE DESIGN. REVISE THE PDP TO INCLUDE THE TEXAS OLIVE TREES FOR SHADE AND HABITAT.

3. At the Development Package submittal stage please provide a set of landscape plans that include planting, irrigation, rainwater harvesting and all applicable notes, specification and details required for construction.

Thank you.

CHAD KELLER, PLA
LANDSCAPE ARCHITECT

CITY OF TUCSON, PDSD, SITE REVIEW SECTION
CHAD.KELLER@TUCSONAZ.GOV
520.837.4923
Site Zoning * REVIEW COMPLETED CDRC Entitlements Pre-Application Transmittal

PDSD Zoning Review



FROM: Loran Shamis; Principal Planner



PROJECT: TP-PRE-1026-00209

Address: (1230 N ALVERNON WY TUCSON, AZ 85712)

Parcel(s): 12213065C and 122130660

Existing Zoning: R-2

Proposed Zoning: R-2 (no change)

Existing Use: Vacant

Proposed Use: Utilities – Distribution System



TRANSMITTAL DATE: November 4, 2026



COMMENTS:

COMMENT: The proposed development requires a Development Package that meets the requirements of Administrative Manual 2-06 – Development Package (Site Plan and Tentative Plat).

COMMENT: A Lot Combination processed through Pima County Assessors is required.

COMMENT: The proposed use is Utilities – Distribution System which is permitted in the R-2 zone through a Zoning Examiner Special Exception Procedure subject to UDC 4.9.11.A.1, .2, .5, .8, .9, .11, .12 (UDC Table 4.8-2).

COMMENT: Per UDC 4.9.11.A.1, the setback of the facility, including walls or equipment, shall be 20’ from any adjacent residential zone. Demonstrate the proposed development meets this requirement to the South and East. It is unclear if the proposed development is meeting this standard.

COMMENT: Per UDC 4.9.11.A.2, where a facility is not enclosed within a building, the surrounding screen shall be used as the building wall for the purposes of setbacks.

COMMENT: Per UDC 4.9.11.A.9, the use shall be located wholly within an enclosed building or within an area enclosed on all sides with a masonry wall or compact evergreen edge, not less than six feet, nor more than ten feet in height. Permission to exceed ten feet in height may be granted through a Board of Adjustment Variance (UDC 3.10.1) during the formal submittal of a Development Package. As a contingency of the discretionary approval, Zoning requests two PDPs, one that meets full code compliance and another with the requested wall height exceeding ten feet.

COMMENT: The maximum height for R-2 is 25’ (UDC Table 6.3-2.A).

COMMENT: The minimum parking requirement is 1 space to 500 square feet of gross floor area with a minimum of 2 spaces (UDC 7.4.4-1).

COMMENT: The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.



If you have any questions, please contact me at Loran.Shamis@tucsonaz.gov.
Traffic Engineering Review * REVIEW COMPLETED No comments
TW New Area Development * REVIEW COMPLETED Based on the information provided, Tucson Water has no objections to the proposed development.
If any new domestic water, irrigation water, or fire water services are needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov.
The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to Deepesh Dawadi (Engineering Manager) at Deepeshraj.Dawadi@tucsonaz.gov.