Plan Number: TP-PRE-0825-00156
Parcel: 117200250

Address:
270 S STONE AV

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0825-00156
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction * REVIEW COMPLETED TP-PRE-0825-00156 • Pre-Application Conference Review v1 • 270 S STONE AV TUCSON, AZ 85701:
Based on the information provided, TFD has no comments at this time.
Questions: patricia.shelton@tucsonaz.gov / 520.837.7082
ROW Engineering Review * REVIEW COMPLETED *Cushing St. is under a pavement moratorium. Any new asphalt that is disturbed will require a 2-inch mill and overlay for 25 feet in each direction from the outside of the cut, for all affected travel lanes.

*New individual service line connections and individual service line repairs may be made in new pavements without a moratorium patch requirement provided the backfill and pavement repair includes NO native backfill and the pavement area affected is less than 4-ft wide to complete the T-Top Patch Detail

*When crossing other utilities larger than 12-inches in diameter, include a vertical profile with a scale of 1” =4’ showing 2’ minimum separation
Site Engineering * REVIEW COMPLETED TP-PRE-0825-00156
270 S STONE AV

Site Engineering has no comments on this proposal.

Ryan Insalaco
Engineering Associate
ryan.insalaco@tucsonaz.gov
Phone: (520) 837-5351
Site Landscape * REVIEW COMPLETED CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: PROVIDE AN ELECTRICAL DISTRIBUTION SYSTEM TO PROVIDE POWER UP TO 30 LEVEL 2 VEHICLE CHARGERS
ACTIVITY NO: TP-PRE-0825-00156
ADDRESS: 270 S STONE AV
ZONING: O-3 OFFICE ZONE; INFILL INCENTIVE DISTRICT; RIO NUEVO AREA

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by the Site Landscape and NPPO section to ensure compliance with the applicable UDC development criteria and Technical Standards.

SITE LANDSCAPE/NPPO COMMENTS:

1. No comments or concerns with regard to the electrical implementation for the EV charging/parking spaces.

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
Site Zoning * REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review
FROM: Krista Hansen, Lead Planner
PROJECT: Pre-submittal meeting: TP-PRE-0825-00156

Parcel: 117200250
Address: 270 S STONE AV
Zoning: O-3, C-3

TRANSMITTAL DATE: August 28, 2025

COMMENTS:
1. Any proposed development must comply with the City of Tucson Unified Development Code (UDC) Administrative Manual Chapter 2-06 – Development Package (DP). A DP with a site plan is required when there is a “reconfiguration of an area outside of a building” (per UDC 3.3.3.G.2.c). Building permits can be submitted and reviewed concurrently with the development package but the building plans cannot be approved until the development package is approved and the building plans are reviewed for consistency.
2. Protective Service (Government Owned) is permitted in O-3 and C-3. This site is located within the Rio Nuevo Area (RNA) and the optional overlay Infill Incentive District (IID) Downtown Core Subdistrict. All development within the RNA requires review and approval by the Design Review Board.
3. Work done within the right-of-way (ROW) requires a ROW Use Permit.
4. Per UDC Section 7.4.6 H.3, there must be a minimum of 2.5 feet (2’-6”) between the wheel stop curbing and the front of the parking space when adjacent to a vertical element (like a wall).
5. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions, please contact me at krista.hansen@tucsonaz.gov.
TW New Area Development * REVIEW COMPLETED TP-PRE-0825-00156 (270 S STONE AV TUCSON, AZ 85701)
CIP PROJECT : PROVIDE AN ELECTRICAL DISTRIBUTION SYSTEM TO PROVIDE POWER UP TO 30 LEVEL 2 VEHICLE CHARGERS.
Based on the information provided, Tucson Water has no objections to, or comments on, the proposed development.
• Please ensure all dry utilities are installed in accordance with Tucson Water Standard Specifications, maintaining the required separation from the water main line.
• Protection at mainline crossings: The Tucson Water Standard Detail SD-108 specifies that telephone, cable television, and electrical cables must be sleeved when crossing a water main.
• Tucson Water Standard Specifications https://www.tucsonaz.gov/Departments/Water/Contractors-Developers-and-Engineers/Tucson-Water-Standard-Specifications-and-Details
The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Abdullah Salman | Project Manager
Tucson Water - New Area Development
Abdullah.Salman@tucsonaz.gov