Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: TP-PRE-0223-00120
Parcel: 10821328B

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0223-00120
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Entitlements REVIEW COMPLETED DATE: 3/15/23
REVIEWED BY: Gabriel Sleighter, Planner
CASE NUMBER: TP-PRE-0223-00120
PROJECT ADDRESSES: 1760 E River Road
PARCEL NUMBERS: 108-21-328B
EXISTING ZONING: C-1
PROPOSED USE: Educational Use, Elementary and Secondary

PROJECT DESCRIPTION & LOCATION:
The proposed special exception request is for the implementation of an individual parking plan to locate a charter school inside of an existing 3-story building with 50-60 students and 20-24 teachers at peak hours. The subject building is part of a commercial development consisting of seven separate buildings. The parcel is located at the intersection of N Campbell Ave and E River Road, in Ward 3. Both Campbell Ave and River Road are designated Scenic Arterial routes. The preliminary development plan shows the new 50-foot-high building with a total of 57,270 square feet of gross floor area.

Because the vehicular and pedestrian access guidelines of UDC 4.9.3.D.7 stipulate that one parallel parking space shall be provided for every 20 students for which the school is authorized, the request for an Individual Parking Plan would allow for a modification based on the parking needs of the school. Land use policy direction for this site is provided by Plan Tucson. This site is not located within any area plan.

APPLICANT NAME: Ty Utton
PHONE: 623-382-6755 E-MAIL tutton@swlaw.com


Plan Amendment

0 YES 1 NO 0 TO BE CONFIRMED LATER

PLAN SUPPORT BASED ON CONCEPT PRESENTED (SEE NOTES BELOW):

1 YES 0 NO 0 WILL DEPEND ON DESIGN

0 DESIGN COMPATIBILITY + COMMUNITY INPUT 0 ENVIRONMENTAL RESOURCE REPORT

PLAN DIRECTION

ADOPTED PLAN(S): Plan Tucson
PLAN AMENDMENT NOT REQUIRED BASED ON CONCEPT PRESENTED (SEE NOTES BELOW)


APPLICABLE PLAN POLICIES:
Plan Tucson
The site lies within the Existing Neighborhoods building block in the Future Growth Scenario Map in Plan Tucson. Existing Neighborhoods are primarily developed and largely built-out residential neighborhoods and commercial districts in which minimal new development and redevelopment is expected in the next several decades. The goal is to maintain the character of these neighborhoods, while accommodating some new development and redevelopment and encouraging reinvestment and new services and amenities that contribute further to neighborhood stability.

Plan Tucson contains no specific policies related to this request.

SURROUNDING ZONING AND USES:
The subject building, and other buildings at this location, are primarily used as offices. The Rillito River is south of the site. A post office is to the west, a commercial strip is across river road to the north, and more commercial and office uses are located in the development to the east, across Campbell Ave. The adjacent properties are zoned C-1 Office, except for the commercial development to the east, which is Pima County CB-1 Local Business Zone.

ANALYSIS:
The proposed use is consistent with Plan Tucson. The proposed use would require 3 parallel parking spaces for passenger drop-off in accordance with UDC 4.9.3.D.7. However, the applicant’s preliminary development plan and attached parking needs analysis for existing Fusion Academy locations indicates that this would not be required and mandating these spaces imposes an unreasonable impediment to their proposed use at this site. As such the request an individual parking plan has been made. Based on the parking study provided, the availability of existing parking at the subject location, and the peak hours which differ from traditional Educational use support this special exception application. No low-density residential developments are directly affected by the proposed parking modification.

Based on the standards listed above from Plan Tucson, No Plan Amendment is required.

ADDITIONAL PLAN POLICIES TO CONSIDER:
None


ADDITIONAL NOTES:
Fire New Construction REVIEW COMPLETED If the building is not equipped with an approved fire alarm system a new fire alarm system shall be installed, permitted and approved through TFD.

Questions:
Patricia Shelton
Tucson Fire Department
Fire Plans Examiner
Patricia.Shelton@tucsonaz.gov
520-837-7082
Site Engineering REVIEW COMPLETED Project: TP-PRE-0223-00120
Address: 1760 E River Rd

Comments:
1. Engineering has no objections to the proposed development

Scott Haseman
scott.haseman@tucsonaz.gov
Site Landscape REVIEW COMPLETED PROJECT: FUSION
ACTIVITY NO. TP-PRE-0223-00120
ADDRESS/PARCEL: 1760 E RIVER RD SUITE 350/108-21-328B
CURRENT ZONING: C-1, MH-1, R-3

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.

The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to assure compliance with the applicable UDC development criteria and Technical Standards.

COMMENTS:
1. Landscape/NPPO has no comments or concerns about this project.

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988
Site Zoning REVIEW COMPLETED Special Exception Pre-Submittal Transmittal

FROM: Nick Martell
PDSD Zoning Review

PROJECT: Rezoning Pre-submittal meeting TP-PRE-0223-00120
Address: 1760 E River RD
Parcel(s): 10821328B
Existing Zoning: C-1
Existing Use: Vacant
Proposed Use: Educational Use- Elementary and Secondary

TRANSMITTAL DATE: March 22, 2023

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. Proposed use and use-specific standards: C-1: 4.9.3.D.1 - 7 and 4.9.13.O OR 4.9.13.O with Zoning Examiner Special Exception Procedure.
3. Development standards: 30 ft building height
4. Perimeter yard setbacks: Adjacent to R-3 Zone: 1 ½ (H). Adjacent to Commercial Zones: 0’
5. Applicable street setbacks: E River RD and N. Campbell RD are both Major Streets and Routes, and subject to MS&R setbacks per 6.4.5 of the UDC. Setbacks are 21’ from the back of the existing or future curb.
6. Parking requirements: See UDC Article 7.4.4 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5445
a. Please see use specific standards above.
7. Bike parking requirements: See UDC Article 7.4.8 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5698
8. Additional comments:
a. Typically, if a special exception is an option, a variance or IPP will not be supported by staff. Please contact Mark.Castro@tucsonaz.gov for any variance related questions.
b. Ensure compliance with the subdivision standards: https://www.tucsonaz.gov/apps/maps-and-records/subdivisions/details/MP-39071&86053882, and;
c. Annexation conditions found in C15-97-01
9. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at nicholas.martell@tucsonaz.gov.
Traffic Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov