Plan Review Detail
Review Status: In Review
Review Details: ENTITLEMENT REVIEW v.2
Plan Number - TP-ENT-1024-00022
Review Name: ENTITLEMENT REVIEW v.2
Review Status: In Review
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
IPC - Traffic Engineering | APPROVED | ||||
Entitlements | IN REVIEW | ||||
External Reviewers - Arizona Department of Transportation (ADOT) | IN REVIEW | ||||
External Reviewers - AZ State Land | IN REVIEW | ||||
External Reviewers - COT Parks & Recreation | IN REVIEW | ||||
External Reviewers - Davis Monthan AFB | IN REVIEW | ||||
External Reviewers - PC RFCD | IN REVIEW | ||||
External Reviewers - Pima Association of Governments | IN REVIEW | ||||
External Reviewers - Pima County Addressing | IN REVIEW | ||||
External Reviewers - Pima County Assessor | IN REVIEW | ||||
External Reviewers - Pima County Development Services | IN REVIEW | ||||
External Reviewers - Pima County Natural Resources | IN REVIEW | ||||
External Reviewers - Pima County Transportation | IN REVIEW | ||||
External Reviewers - Pima County Wastewater (RWRD) | IN REVIEW | ||||
External Reviewers - Tohono Oodham | IN REVIEW | ||||
External Reviewers - Tucson Airport Authority | IN REVIEW | ||||
External Reviewers - Tucson Electric Power (TEP) | IN REVIEW | ||||
External Reviewers - Tucson Unified School District (TUSD) | IN REVIEW | ||||
Sun Tran Review | IN REVIEW | ||||
Transportation - Bike/Ped | IN REVIEW | ||||
Historic | NOT REQUIRED | No Historic review needed for the Special Exception as these crossings are not within HPZ. | |||
Real Estate | NOT REQUIRED | ||||
Site Landscape | NOT REQUIRED | All work appears to be in the ROW. Please contact DTM for further site landscape information. Thank you, Chad Keller, RLA chad.keller@tucsonaz.gov |
|||
Streetcar Track Access Review | NOT REQUIRED | ||||
Entitlement Review Coordinator Express | REVIEW COMPLETED | ||||
External Reviewers - COT Environmental Services | REVIEW COMPLETED | ES has no objections to this special exception request. Thanks, Andy Vera (520) 837-3798 Andy.Vera@tucsonaz.gov |
|||
Fire New Construction | REVIEW COMPLETED | ||||
IPC - Entitlements | REVIEW COMPLETED | ||||
IPC - Fire New Construction | REVIEW COMPLETED | ||||
IPC - Site Engineering | REVIEW COMPLETED | 1. Site Engineering has no objections to the proposed special exception land use. However, floodplain use permits will be required for future poles along W Grant Rd at and west of N 14th Ave. Mike Ortiz michael.ortiz@tucsonaz.gov |
|||
IPC - Site Zoning | REVIEW COMPLETED | ||||
ROW Engineering Review | REVIEW COMPLETED | Utility Construction plan required for review/approval by DTM Engineering Division prior to applying for ROW permits. See section 9.2 in the Public Utility Administrative Manual for Plan Requirements. The location of replacement poles, new poles, and supporting equipment must comply with the Americans with Disabilities Act, city construction and sidewalk clearance standards, city ordinances, and state and federal laws and regulations to provide a clear and safe passage within the Public Right-of-way. Submit construction plans and supporting documents under “Public Utility Review Plan Review” on TDC online for DTM staff review. Contact ROWEngineeringReview@tucsonaz.gov if you have any questions on construction plan requirements, supporting documents or technical standards. |
|||
Signs | REVIEW COMPLETED | All signage to be per current code. If you have questions about this transmittal, please contact me at Georgia.Pennington@tucsonaz.gov. |
|||
Site Engineering | REVIEW COMPLETED | 1. Site Engineering has no objections to the proposed special exception land use. However, floodplain use permits will be required for future poles along W Grant Rd at and west of N 14th Ave. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
|||
Site Zoning | REVIEW COMPLETED | FROM: Loran Shamis; Principal Planner PROJECT: TP-ENT-1024-00022 Address: 2411 N ORACLE RD Parcel(s): N/A - Right of way Zoning: C-2 Proposal: Overhead Transmission Line crossing Gateway Corridor of Oracle Road COMMENT: UDC 4.9.11.A.13.a – This standard is applicable - demonstrate how this standard is being met. COMMENT: UDC 4.9.11.d - Zoning acknowledges there has been a narrative clarifying that the proposal has been modified to relocate the proposed pole to the west of Oracle to the south side of Grant to prevent the transmission line from diagonally crossing the intersection; however, there is a discrepancy in the exhibits of the Key Observation Points attached to the narrative which demonstrates the transmission lines crossing diagonally across the intersection. Please ensure all exhibits are accurately demonstrating the final proposal and complies with the above standard. COMMENT: UDC 4.9.11.d - Please clearly dimension the distance between the curbline of the designated Gateway Corridor to the proposed placement of the poles. Zoning acknowledges the key to the PDP demonstrating the 150’ buffer but would prefer the PDP clearly dimensions the distance from the curbline to ensure the 150’ is measured from the appropriate location per the UDC standard. COMMENT: 4.9.11.A.13.g – Demonstrate how standard is met. Clarifying the potential customers does not demonstrate how “electrical service to critical customers where overhead lines are strongly recommended for specialized operations” is being met. COMMENT: 4.9.11.A.13.h – TEP provides service to all customers in the region. Citing poverty standards for Tucson residents, only, is not accurate. Provide more applicable information. |
|||
Transportation Landscape Review | REVIEW COMPLETED | ||||
Tucson Water New Area Development | REVIEW COMPLETED | TP-ENT-1024-00022 - Entitlement Review v2 – 2411 N ORACLE RD The City of Tucson’s Water Department (Tucson Water) has no objections to granting the requested Special Exception Land Use Permit for an overhead 138 kV transmission line perpendicularly crossing the Gateway Corridor Zone of Oracle Road. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |