Plan Number: TD-DIV-1122-00015
Parcel: 141010130

Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.2

Plan Number - TD-DIV-1122-00015
Review Name: LAND DIVISION/SUBDIVISION v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
New Services/JOC APPROVED TD-DIV-1122-00015 - Land Division_Subdivison v2 – 9595 E VALENCIA RD

1. Tucson Water has no objections to the proposed final plat.

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
CDRC Post Review PENDING ASSIGNMENT
Final Plat Package PENDING ASSIGNMENT
Site Engineering REQUIRES RESUBMIT 1. On the cover sheet the legend shows IE as the abbreviation for Irrigation Easement yet all through the plat the call outs are labeled IRR Easement. Revise as necessary for clarity and consistence.
2. Provide the assurance agreement on the next submittal.
3. Correct the title on the CC&Rs to match the full title of the plat found in the title block.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: La Escalera Phase 1, Lots 1-219
FINAL PLAT (2nd Review)
TD-DIV-1122-00015

TRANSMITTAL DATE: June 22, 2023

DUE DATE: July 14, 2023

2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.
COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.
2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and

2-07.5.0 CONTENT REQUIREMENTS2-07.5.1
General

1. COMMENT: 2-07.5.1.H – Zoning acknowledges that the incorrect case number, TD-DEV-1122-00015, was provided on the previous comment. Ensure that the plat case number is changed to TD-DIV-1122-00015, prior to submitting the mylar.

2-07.5.6 Protective Covenants
Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will:
2. COMMENT: 2-07.5.6 – The title on the CC&R’s shall match the title block on the final plat.

Additional comments:

3. COMMENT: – Until DP22-0032 is approved by all review agencies Zoning cannot approve this plat.

If you have any questions about this transmittal, please contact Nicholas Martell at Nocholas.Martell@tucsonaz.gov.
CDRC Application Completeness REVIEW COMPLETED