Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: LAND DIVISION/LOT SPLIT v.1
Plan Number - TD-DIV-0725-00075
Review Name: LAND DIVISION/LOT SPLIT v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Record Documents Express | PENDING ASSIGNMENT | ||||
| Site Engineering Fast | REQUIRES RESUBMIT | 1. See zoning | |||
| Site Zoning Fast | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: 1036 N 1ST AV. – HR-1 TD-DIV-0725-00075 Land Split/Reconfiguration (1st Review) TRANSMITTAL DATE: July 15, 2025 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. SECTION 2-08.0.0: LAND SPLIT 2-08.2.0 APPLICABILITY 1. Per UDC Article 8.3.1.E.2 a land split may not result in tracts or parcels which do not conform to the minimum lot size requirements of the property’s zone. Per UDC Table 6.3-2.A, the minimum lot size in the R-1 zone is 7,000 Sq. Ft. This land split cannot be approved as submitted. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
|||
| CDRC Application Completeness Express | REVIEW COMPLETED | ||||
| Commercial Building Fast | REVIEW COMPLETED | Not Commercial, please see Residential Building review | |||
| Commercial Plumbing Fast | REVIEW COMPLETED | ||||
| Residential Building Fast | REVIEW COMPLETED | ||||
| TW New Development Review Fast | REVIEW COMPLETED | Tucson Water has no objections to the proposed land division. |