Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: TD-DIV-0523-00061
Parcel: 12913377A

Review Status: Requires Resubmit

Review Details: LAND DIVISION/LOT SPLIT v.1

Plan Number - TD-DIV-0523-00061
Review Name: LAND DIVISION/LOT SPLIT v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Residential Building APPROVED
Commercial Building NOT REQUIRED
Record Documents Express PENDING ASSIGNMENT
Commercial Plumbing REQUIRES RESUBMIT 1. Verify the location and route of the building sewer serving 1207 E 36th Street. The Pima County Historical Sewer Records show the existing building sewer is approximately 9’ east of the existing dwelling. If the building sewer encroaches onto 1215 E 36th Street, a utility easement will be required.
2. A new dwelling constructed at 1215 E 36th Street will require an independent connection to the public sewer located along the south side of 36th Street. A joint sewer use authorization will not be approved.
Site Engineering REQUIRES RESUBMIT 1. Correct the legal description per zoning comment.

Lianne Evans
lianne.evans@tucsonaz.gov
Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: 3432 E Lee St.. – R-1
TD-DIV-0523-00061
Lot Line Reconfiguration (1st Review)

TRANSMITTAL DATE: May 5, 2023, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.
SECTION 2-08.0.0: LAND SPLIT

2-08.3.0 APPLICATION SUBMITTAL REQUIREMENTS
1. COMMENT: 2-08.3.7 – The legal descriptions are not correct and should be “GRAND VIEW LOT 7 EXC 36TH ST BLK 28” & “GRAND VIEW LOT 8 EXC 36TH ST BLK 28”.

2-08.5.0 CONTENT REQUIREMENTS
2. COMMENT: 2-08.5.F – Provide the height of the east exterior for the house on Lot 7 so that perimeter yard setback requirements can be verified.

3. COMMENT: 2-08.5.G – Provide a lot coverage calculation for Lot 7 that meets the requirements of UDC Article 6.4.3 and the example shown on the Residential Plot Plan Requirements found at: https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Requirements.pdf,

If you have any questions about this transmittal, please contact Nicholas Martell at Nocholas.Martell@tucsonaz.gov.
CDRC Application Completeness Express REVIEW COMPLETED
TW New Development Review REVIEW COMPLETED TD-DIV-0523-00061 - Land Division_Land Split_Lot Split v1 – 1207 E 36TH ST

1. Tucson Water has no objections to the proposed Land Division / Lot Split.
2. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov