Plan Review Detail
Plan Number: TD-DIV-0326-00020
Parcel: 11720019C
Review Status: Requires Resubmit
Review Details: LAND DIVISION/SUBDIVISION v.2
Plan Number - TD-DIV-0326-00020
Review Name: LAND DIVISION/SUBDIVISION v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Site Zoning Standard | APPROVED | ||||
| External Reviewers - Pima County Wastewater (RWRD) Standard | NOT REQUIRED | ||||
| CDRC Post Review Express | PENDING ASSIGNMENT | ||||
| External Reviewers - Arizona Department of Transportation (ADOT) Standard | REQUIRES RESUBMIT | Fwd: TDC External Review PERMIT: TD-DIV-0326-00020 Please Sign-In DUE: 5/20/2026 rfreije@azdot.gov on behalf of ADOT SC Traffic Engineering - ADOT<adotsctrafficengineering@azdot.gov> CDRC The Developer needs to fill out the attached form to determine whether a traffic impact study is needed, and if so, to verify the preliminary assumptions. The completed form should be emailed to my primary inbox at rfreije@azdot.gov. Thanks, Rick Freije |
|||
| Site Engineering Standard | REQUIRES RESUBMIT | Site Engineering Review TD-DIV-0326-00020 175 W BROADWAY BL Description: Minor Subdivision for Hotel Arizona Site Engineering comments are as follows: 1. In the Dedication language, include this paragraph: “We hereby grant to the public and all utility companies all easements as shown hereon for the purposes of access for installation and maintenance of public sewers and utilities and other uses as designated by this plat.” AM 2-07-5.3.B.2.b 2. Provide a title report tracing the ability of Omar Mireles to sign for the interested parties under the Dedications section. To re-submit, visit the Tucson Development Center Online at: https://tdc-online.tucsonaz.gov/#/home The instructions for resubmittal can be found at: Revisions and Resubmittals Engineering Associate: Ryan Insalaco ryan.insalaco@tucsonaz.gov |
|||
| CDRC Application Completeness Express | REVIEW COMPLETED | ||||
| ROW Engineering Review Standard | REVIEW COMPLETED | Previous comments have been addressed, DP should show updated pedestrian access easement |