Permit Number: TD-DEV-1224-00342
Parcel: 13109123H

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-1224-00342
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/21/2025 CDRC Post Review Express PENDING ASSIGNMENT
01/15/2025 Commercial Plumbing REQUIRES RESUBMIT The rim elevation of the next upstream sanitary manhole (9674-13, 2605.30’) is less than 12” below the first floor elevations of the four units (2606.10’). Provide backwater valves per Section 714.1, IPC 2018, as amended by the City of Tucson.
02/21/2025 External Reviewers - Tucson Electric Power (TEP) REQUIRES RESUBMIT No Response from TEP- TEP will be re-added next review cycle
01/21/2025 NPPO REQUIRES RESUBMIT Please see Site Landscape Comments for NPPO requirements.

Thank you.
Chad Keller, RLA
Chad.Keller@tucsonaz.gov
12/31/2024 ROW Engineering Review REQUIRES RESUBMIT TD-DEV-1224-00342 •1603 S VAN BUREN AV

1. Per Tucson City Code (TCC) Sec. 25-43, the existing unused driveway opening on 26th St will have to be closed. Revise drawing to indicate that the unused curb opening will be closed with matching curb.

If you have any questions, please contact Richard Leigh at richard.leigh@tucsonaz.gov.
01/17/2025 Site Engineering REQUIRES RESUBMIT 1. Put complete permit number TD-DEV-1224-00342 on all sheets of the plan set.
2. Provide waste stream calculations per TSM 8 with an explanation for the proposed waste collection including pickup location. Per TSM 8-01.4.G: use of APCs for multi-family, commercial, or industrial development requires prior from ES. ES can be added on the next review cycle.
3. Relocate or reconfigure bike parking per Zoning comments 10/13.
4. Remove/relocate the wall from the basin in the southwest portion of the site.

Mike Ortiz
michael.ortiz@tucsonaz.gov
01/21/2025 Site Landscape REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: MULTI-FAMILY DEVELOPMENT
ACTIVITY NO: TD-DEV-1224-00342
ADDRESS: 1603 S VAN BUREN AV
ZONING: R-2 RESIDENCE ZONE
LAND USE: MULTIFAMILY

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape/NPPO Section review comments have been addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Label sight visibility triangles as well as existing and future ROWs on all landscape plans.

2. Label the project property lines on all landscape sheets.

3. It appears that the (PIP) Blue Palo Verde and Velvet Mesquites are being counted towards the street landscape border tree requirement, which is fine. Can an additional tree be added to the street landscape border along Van Buren, south of the entry drive for project design symmetry and aesthetics.

4. For the preserve in place (PIP) trees add a protective fencing detail to the plan set. Show protective fencing line work in its approximate location at the perimeter/dripline of the tree to be preserved.

5. PIP trees and cacti general comment: How will the basins be constructed around the existing plants? Exposing the roots to construct the basins will kill the tree. Saguaro will not survive standing water within a basin. Adjust the basins to accommodate the existing plants to be preserved in place.

6. Add a Native Plant Preservation Plan Summary that breaks down the findings associated with the two spreadsheets on the NPPO sheet. Example: Total number of viable protected native plants inventoried within the project limits; number of native plants to be preserved on site; number of transplants required on site; number of plants required for mitigation of transplanted or removed plants. This summary should be located on the planting plan as well for simpler reference and review.

7. Add tree staking general notes to the plans and details:
- Tree stakes are not required for 5 gal. Trees
- Tree stakes may be omitted if tree is able to support itself upright without leaning or bending
- When stakes are installed, ties should be placed as low as possible while still providing necessary support. Cut stake approx. 6" above tie to avoid branches rubbing on stake
- All nursery stakes are to be removed regardless of plant size

8. Add a detail that shows a multi-trunk tree with no stakes and a note to remove the nursery stake. Both species of trees proposed on this site are multi-trunk trees. There have been many instances out on project sites that the staking for multi-trunk trees are being staked in a way that is detrimental to the tree’s establishment and overall health.

9. Add a time period advisement for removal of tree stakes. The plant warranty period or the one-year mark or upon owner or owner’s representative discretion. This is something that has been observed on finished project sites. The staking cinch-ties have been constricting and damaging newly planted trees.

10. The screen wall in the southwest corner of the site will need to be removed due to its location within the drainage basin. Constructability of the basin around the wall and maintenance are a concern.

11. Walls are not a requirement for Multifamily developments adjacent to streets. I am ok with the existing short wall located at the back of the street landscape border along Van Buren and along the top of the basin if there is truly enough space to provide the required 10-foot landscape border between the property line and the wall. The wall corner in the northwest portion of the site is very tight to the property line. Additionally, the vegetative groundcover appears to be light in this area. Add a few more shrubs/accents to the northwest corner in the street landscape border.

12. In the southwest corner of the site there is mainline and poly tubing crossing hardscape/sidewalk. Add sleeving in all applicable areas on site.

13. Add a single port emitter for shrubs/accents/groundcovers to the detail sheet.

14. Commercial Rainwater Harvesting Plan general comment: The basins should be organic in shape. The squared off corners are not practical for construction and the contractor will try to build them the way they are drawn on the plan. Basins near hardscape/sidewalk should have separation between the walk and the top of the slope into the depressed area. Adjust as necessary.

15. As a standard practice, a few proposed spot elevations on the CRWHP at the bottom of basin and basin curb cut inlets and outlets that match the civil grading plan for coordination between the plans should be included on the CRWHP. Just a few spot elevations in key locations as a quick reference for the contractor and inspectors. Also add direction flow line arrows from the building roof tops, and other ground level impervious areas toward the basins.

16. On the rainwater harvesting plan add these general notes for construction clarity. Wording similar to the following will provide clear direction/coordination and intent for the contractor’s reference:

a. See Civil Grading Plan for additional information on basin side slopes, spot elevation, shape, contouring, flow lines, curb cuts, downspouts, splash pads, etc.

b. This Rainwater Harvesting Plan is designed to work in conjunction with the civil grading and plans. The intent of the Rainwater Harvesting Plan is to demonstrate that the site grading and drainage facilitates direct flow of impervious-surface runoff in sufficient quantities to the depressed planting areas to comply with the Commercial Rainwater Harvesting Ordinance. It is the Contractor's responsibility to meet the requirements of Site Grading and Drainage plans and the Rainwater Harvesting Plan and to notify the engineer and landscape architect of any discrepancies between the two plans.

17. A rainwater harvesting basin schematic detail is not a requirement but adding it to CRWHP would be a nice addition for construction clarity. If you would like to add the detail and need an example, please reach out and I will send an example of the schematic for reference.

18. The rainwater harvesting legend hatches and number (1) WHIA and number (1A) SWA are not shown on the plan view for review. Coordinate the hatches and WHIA and SWA number callouts on the plan view.

19. All reference to screened rock shall also indicate that the rock will be washed. The wording “washed screened rock” will help with any miscommunication between what is approved on the plans and what is implemented on site.

20. Provide the development package case number, TD-DEV-1224-00342, adjacent to the title block on all sheets. 2-06.4.3

21. Prior to Site Landscape Development Package approval, please make sure Site Zoning and Site Engineering comments are addressed.

If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov
or at 520.837.4923
01/15/2025 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM: Bobby Parsons
PDSD Zoning Review Section

PROJECT: Multi-family development
Development Package (1st Review)
TD-DEV-1224-00342 (1603 S Van Buren Av Tucson, AZ 85711

TRANSMITTAL DATE: 1/15/2025
DUE DATE: 1/16/2025

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is December 17, 2025.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

2-06.3.0 FORMAT REQUIREMENTS

2-06.3.8 - The north arrow, contour interval, and scale as applicable to each sheet should be placed together in the upper right corner of each sheet.

1. COMMENT: 2-06.3.8 – Please add the contour intervals on sheet 3 under the North arrow as noted by standard above.

CONTENT REQUIREMENTS

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

2. COMMENT: 2-06.4.3 – Please provide the development package number, TD-DEV-1224-00342, adjacent to the title block on each sheet.

2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and,

3. COMMENT: 2-06.4.4.B – Please label Craycroft Road and Van Buren Avenue on the location map as noted by the standard above.

2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled.

4. COMMENT: 2-06.4.4.C – Please label the section corners for the intersection at 22nd Street and Craycroft Road as noted by the standard above.

2-06.4.8 - Existing Site Conditions

2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks.

5. COMMENT: 2-06.4.8.C – Please provide the missing information for Van Buren Ave and 26th Street (ie pavement width, etc) per the standard above.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.H.2 - Show future and existing sight visibility triangles. On a designated MS&R street, the sight visibility triangles are based on the MS&R cross-section.

6. COMMENT: 2-06.4.9.H.2 – Please draw and label the SVT for 26th Street along the North side of the project. Please refer to Technical Standards 10-01.5.2 for placement of SVT based on the ADT. (In order to verify that the 5’ wall will not be encroaching into the SVT.)

2-06.4.9.H.4 - Indicate if existing streets are public or private; provide street names, widths, curbs, sidewalks, and utility locations, all fully dimensioned.

7. COMMENT: 2-06.4.9.H.4 – Please provide the missing information for both Van Buren Avenue and 26th Street as noted by the standard above.

2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

8. COMMENT: 2-06.4.9.H.5 – Please clarify if the sidewalk adjacent to the backup spur is flush with the parking lot pavement or elevated. Physical separation must be provided adjacent to the backup spur and the sidewalk. Also, please dimension the distance between the wheel stops and the sidewalk (minimum 2.5 feet).

2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

9. COMMENT: 2-06.4.9.H.5.a – Per UDC Table 7.4.4-1, the minimum required parking spaces for a multifamily development on a single site with 2-5 units is 1 space per dwelling unit. The plans provided have parking calculated at 2.25 spaces per unit. Please update your plans as noted by the standard above. Since the required EV spaces are based on the required parking spaces, please update the required EV spaces. UDC Table 7.4.11-1 has the minimum EVSE.


2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided.

10. COMMENT: 2-06.4.9.H.5.d – Bicycle parking cannot impede pedestrian circulation. Please update the short term bicycle rack to comply with the standard noted above.

2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown.

11. COMMENT: 2-06.4.9.O – Please include the sight visibility triangle along 26th Street since there is an existing 5’ wall along 26th Street as noted by the standard above.

2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

12. COMMENT: 2-06.4.9.Q – The allowed height listed in General Note 12 is incorrect. The maximum allowed height in the R-2 zone is 25’. Please update the allowed height and include the overall height of each unit within the footprint of the buildings as noted by the standard above.

2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual.

13. COMMENT: 2-06.4.9.R – Bicycle parking cannot impede pedestrian circulation. UDC figure 7.4.9-B provides acceptable bicycle parking layouts. A clearance space of at least 4’ in width must be provided for pedestrian access. The plans show only 3’ between the short term racks and Unit 1.

2-06.4.9.T - Show refuse collection areas, including locations of dumpsters, screening location and materials, and vehicle maneuverability, fully dimensioned, and access route. If dumpster service is not proposed, indicate type of service. For specific information on refuse collection, refer to Section 8-01.0.0, Solid Waste and Recycle Disposal, Collection, and Storage, of the Technical Standards Manual. Refuse collection on all projects shall be designed based on that section, even if collection is to be contracted to a private firm.

14. COMMENT: 2-06.4.9.T – Please draw and label the location where the refuse containers will be housed as noted by the standard above.

2-06.4.9.V - For gang mailboxes indicate location to assure there are no conflicts with other requirements, such as pedestrian accessibility, utilities, and landscaping.

15. COMMENT: 2-06.4.9.V – Please draw and label the location of the gang mailboxes as noted by the standard above.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations

If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
12/17/2024 CDRC Application Completeness Express REVIEW COMPLETED
12/27/2024 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added Addressing and TEP, PAG, USPS, SWG to the workflow. FYI email sent to PAG, USPS, SWG.
12/27/2024 External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
01/30/2025 External Reviewers - Pima County Addressing REVIEW COMPLETED Good afternoon,



Pima County Addressing approves TD-DEV-1224-00342.
12/27/2024 External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
12/27/2024 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
01/14/2025 Fire New Construction REVIEW COMPLETED
12/23/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
12/24/2024 OK to Submit - Zoning Fast REVIEW COMPLETED