Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-1224-00341
Parcel: 14043011A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-1224-00341
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/15/2025 Commercial Plumbing APPROVED
01/17/2025 NPPO NOT REQUIRED
01/17/2025 Site Landscape NOT REQUIRED
01/17/2025 CDRC Post Review Express PENDING ASSIGNMENT
01/16/2025 Site Engineering REQUIRES RESUBMIT TD-DEV-1224-00341
1960 E VALENCIA RD

Please show compliance with the Master Airport Drainage Plan / TIA Airport Wide Drainage Basin Study.

Chris Arrington
chris.arrington@tucsonaz.gov
01/16/2025 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: TIA - Hangar A-10 - New Paved Area
Development Package (1st Review)
TD-DEV-1224-00341

TRANSMITTAL DATE: January 16, 2025

DUE DATE: January 15, 2025

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is December 23, 2025.

2-06.4.0 CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-1224-00341, adjacent to the title block on all sheets.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
12/16/2024 CDRC Application Completeness Express REVIEW COMPLETED
12/27/2024 CDRC Review Coordinator Express REVIEW COMPLETED External Reviewers not required. No further action is required from the applicant at this time.
01/14/2025 Fire New Construction REVIEW COMPLETED
12/23/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
12/24/2024 OK to Submit - Zoning Fast REVIEW COMPLETED
12/30/2024 ROW Engineering Review REVIEW COMPLETED DTM Engineering Review has no comments.
12/29/2024 ROW Review REVIEW COMPLETED