Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-1224-00339
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/14/2025 | Commercial Plumbing | APPROVED | |||
01/17/2025 | NPPO | NOT REQUIRED | |||
01/17/2025 | Site Landscape | NOT REQUIRED | |||
01/17/2025 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
01/17/2025 | Site Engineering | REQUIRES RESUBMIT | TD-DEV-1224-00339 1961 E AIRPORT DR 1. Per Admin Manual 2-06.4.3 The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. Chris Arrington chris.arrington@tucsonaz.gov |
||
01/16/2025 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TIA - Fuel station expansion Development Package (1st Review) TD-DEV-1224-00339 TRANSMITTAL DATE: January 16, 2025 DUE DATE: January 15, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is December 22, 2025. 2-06.4.0 CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-1224-00339, adjacent to the title block on all sheets. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 2. COMMENT: 2-06.4.7.A.1 – The zoning listed under General Note 3 for this area of TIA is not correct and should be MU. 3. COMMENT: 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. Fuel Station is not a use classified in the UDC. The use should be Transportation Service: Airport Authority, subject to Use Specific Standard 4.9.13.Q.5. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 4. COMMENT: 2-06.4.9.H.5.a – The vehicle parking space calculation is not correct. Per UDC Table 7.4.4-1 no spaces are required. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
12/16/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
12/24/2024 | CDRC Review Coordinator Express | REVIEW COMPLETED | External Reviewers not required. No further action is required from the customer at this time. | ||
01/09/2025 | Fire New Construction | REVIEW COMPLETED | |||
12/23/2024 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
12/23/2024 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
12/30/2024 | ROW Engineering Review | REVIEW COMPLETED | |||
01/02/2025 | ROW Review | REVIEW COMPLETED |