Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-1223-00493
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/14/2025 | Site Landscape | APPROVED | |||
| 03/21/2025 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 03/10/2025 | Commercial Plumbing | REQUIRES RESUBMIT | With the new manhole rim and finish floor elevations, Lot 22 will not require the addition of a backwater valve. Reference: Section 714.1, IPC 2018, as amended by the City of Tucson. | ||
| 03/14/2025 | Site Engineering | REQUIRES RESUBMIT | 1. See TSMR comments | ||
| 03/21/2025 | Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Fernando Garcia PDSD Zoning Review Section PROJECT: FLD (Flexible Lot Development) TD-DEV-1223-00493 910 E Valencia Rd, Tucson, AZ 85747 Development Package (3rd Review) TRANSMITTAL DATE: March 21, 2025 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is October 22, 2025. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) Final approval of this permit by Site Zoning is contingent upon approval of the TSMR first. Once the TSMR is approved, please resubmit. |
||
| 03/06/2025 | TSMR/PDMR - Engineering | REQUIRES RESUBMIT | 1. Please include the waste stream calculations on the plans. 2. Engineering and zoning both have concerns about the trash enclosure location, its not very centralized and it seems to require excessive travel for anyone in lots 39-45. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 03/06/2025 | TSMR/PDMR - Zoning | REQUIRES RESUBMIT | See Engineering comments | ||
| 03/21/2025 | External Reviewers - Pima County Addressing | REVIEW COMPLETED | Good morning, Pima County Addressing approves TD-DEV-1223-00493. Thank you Nicholas Jordan Site Review Project Manager II – Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |