Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-1023-00419
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/13/2023 | External Reviewers - Tucson Airport Authority | APPROVED | November 13, 2023 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-1023-00419, Restriping and Signage remodel package at North parking lot area of existing TUS2 Amazon Facility / 6701 S Kolb Rd, Tucson, AZ. 85756, Received October 20, 2023 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-01023-00419, a development plan for restriping an existing parking lot and installed new signage at 6701 South Kolb Road. This development is located in the N.W. quarter of the N.W. quarter of Section 17, Township 15S, Range 15E, of the Gila and Salt River Meridian. The development site occupies parcel number 141-07-026A, covers approximately 79.484 ± acres, and is zoned as Planned Area Development 26 (PAD-26). The nearest major roadway intersection is East Littetown Road and South Kolb Road, approximately 1100 feet to the southwest of the subject development. This site does lie within FAA Part 77 airspace. The Tucson Airport Authority approves the proposed project and is not requiring a resubmittal. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning | ||
11/09/2023 | NPPO | APPROVED | |||
11/06/2023 | Site Engineering | APPROVED | |||
11/09/2023 | Site Landscape | APPROVED | |||
11/13/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
10/26/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Restriping and Signage Remodel - TUS2 Amazon Facility Development Package (1st Review) TD-DEV-1023-00419 TRANSMITTAL DATE: October 26, 2023 DUE DATE: November 09, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is October 16, 2024. 2-06.3.0 FORMAT REQUIREMENTS 1. COMMENT: 2-06.3.12 – Revise the sheet index to include all sheets submitted. 2-06.4.0 CONTENT REQUIREMENTS 2. COMMENT: 2-06.4.2.D – The total number of sheets shall reflect all sheets submitted. Sheets 25 – 27 provide the page number and the total number of pages in the package within the title block. 3. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-1023-00419, adjacent to the title block on all sheets. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 4. COMMENT: 2-06.4.7.A.1 – Revise Permitting Note 1 to reflect the correct zoning. 5. COMMENT: 2-06.4.7.A.3 - Revise Permitting Note 11 to reflect the correct rezoning case number C15-14-01. 6. COMMENT: 2-06.4.7.A.6.a - Revise Permitting Note 3 & 4 to reflect the correct code sections. 7. COMMENT: 2-06.4.7.A.6.a – Remove all references to Pima County Code and Requirements from the plan and if applicable provide the correct COT code references. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 8. COMMENT: 2-06.4.9.H.5 – Per UDC Article 7.4.6.F.2.b show the required 2’ setback from the proposed jersey barriers. 9. COMMENT: 2-06.4.9.H.5.a – Provide a wheel stop location dimension, UDC Article 7.4.6.H.3. 10. COMMENT: 2-06.4.9.H.5.a – As vehicle parking spaces are being removed provide a revised vehicle parking calculation. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter. |
||
10/11/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
10/20/2023 | CDRC Review Coordinator | REVIEW COMPLETED | Review request email sent per TAA; FYI email sent to PAG, USPS, SWG & TEP. 1st Submittal, Due Nov 17th. | ||
10/20/2023 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | FYI email sent to PAG, USPS, SWG & TEP. 1st Submittal, Due Nov 17th. | ||
10/20/2023 | External Reviewers - Southwest Gas | REVIEW COMPLETED | FYI email sent to PAG, USPS, SWG & TEP. 1st Submittal, Due Nov 17th. | ||
10/20/2023 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | FYI email sent to PAG, USPS, SWG & TEP. 1st Submittal, Due Nov 17th. | ||
10/20/2023 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | FYI email sent to PAG, USPS, SWG & TEP. 1st Submittal, Due Nov 17th. | ||
10/26/2023 | Fire New Construction | REVIEW COMPLETED | |||
10/17/2023 | OK to Submit - Engineering | REVIEW COMPLETED | |||
10/16/2023 | OK to Submit - Landscape | REVIEW COMPLETED | |||
10/12/2023 | OK to Submit - Zoning | REVIEW COMPLETED |