Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 6701 S KOLB RD
Search
Parcel Attributes
Parcel | 14107026A 141070220 99999999Z |
---|---|
Jurisdiction | Tucson, Pima County |
City of Tucson Zoning | PAD-26 |
Water Course | Washes |
Airport Environs Zone | NCD-B Davis Monthan AEZ Paddle ,Tucson International AEZ Paddle |
Tucson Ward | Ward 4 |
Flood Related Information | FEMA Floodplain Area |
Major Streets & Routes | Gateway Route |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Annexations & Original City Zoning (OCZ)
Address: 6701 S KOLB RD
Date - 12/23/2024 12:55 p.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 6701 S KOLB RD
Date - 12/23/2024 12:55 p.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T20SA00172 | COMPLETE | 06/10/2020 | N/A | Zoning Adminstration Letter |
Permits
Address: 6701 S KOLB RD
Date - 12/23/2024 12:55 p.m.
Total Number Of Permits - (17)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TF-FCP-1222-00242 | Complete | 12/29/2022 | N/A | Fire Construction Permit | ERRCS DAS system supporting first responder Two Way Radio coverage inside of the structure. | |
TF-FOP-1224-01528 | Submitted - Online | 12/20/2024 | N/A | Fire Operational Permit | Two (2) 438 gallon diesel tanks associated with the emergency generators onsite and one (1) 700 gallon diesel tank associated with the fire pump onsite. Installed in 2018 but directed by Inspector Jesús to obtain operational permit. Records obtained before online system was in place are not on file. | |
T19CM09035 | Expired | 12/10/2019 | 11/30/2020 | Commercial Building | TI: DISTRUBUTION CENTER - INSTALL FANS | |
TC-COM-1023-02416 | Expired | 10/16/2023 | 04/13/2024 | Commercial Building | Install a RO (Reverse Osmosis) system. with appropiate piping. | |
TD-DEV-1023-00419 | Issued | 10/10/2023 | 03/20/2027 | Development Package | *Revision #1 started 1/25/24* Restriping and Signage remodel package at North parking lot area of existing TUS2 Amazon Facility. | |
T20CM05745 | Expired | 09/01/2020 | 04/19/2021 | Commercial Building | FAN INSTALL | |
T21RW03971 | Fees Paid | 08/25/2021 | 01/19/2023 | Right-of-Way (ROW) | TEP TO DIG 7' HOLE IN DIRT TO INSTALL NEW FOUNDATION POLE & 350' OF OVERHEAD WIRE. WO 6332496 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 3. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 4. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 5. MAINTAIN PEDESTRIAN ACCESS | |
TR-ROW-0423-00657 | Needs Resubmittal | 04/20/2023 | N/A | Right-of-Way (ROW) | TRANSIT STOP ON PRIVATE PROPERTY ASSOCIATED ROW WORK TO IMPROVE ACCESS FOR TRANSIT BUSES | |
TC-COM-0324-00500 | Issued | 03/21/2024 | 04/09/2025 | Commercial Building | POWER MODIFICATIONS PER CONSTRUCTION PLAN SET | |
TC-COM-0224-00347 | Needs Resubmittal | 02/22/2024 | 08/20/2024 | Commercial Building | Pull electrical to support 38 AirEye and 13 PowerFoil fans throughout the warehouse To include: - Electrical pull for all fans in preparation for others to complete the mechanical installation | |
T22FC00046 | Expired | 01/18/2022 | 05/03/2023 | Fire Construction Permit | Fire Alarm & Detection Systems - TIE IN OF 5 MONITOR MODULES FOR DAS SYSTEM.; Fire Alarm Systems - Devices Modified: 5 | |
T19OT00849 | FINAL | 09/04/2019 | 06/03/2020 | SIGN | 1-NON ILLUM WALL SIGN | |
T20CM05748 | WITHDRWN | 09/01/2020 | N/A | COMBO | FAN INSTALL | |
T20FC00437 | FINAL | 07/02/2020 | 04/26/2021 | FIRECONS | Installation of 3,334.5 kW DC (2640 kW AC) Photovoltaic Solar System. on the rooftop of Amazon TUS2 Center, located on 6701 S. Kolb Rd. | |
T20RW04596 | FINAL | 08/12/2020 | 09/17/2020 | ROW | We will perform a vertical boring to an approximate depth of 40 feet below existing grade. The bore hole will be approximately 7 inches in diameter. The location of the boring will be approximately 30 feet south of the the south curb adjacent to Valencia Road (see site plan for details). Our work will take approximately 2 hours to complete. | |
T21CM04256 | FINAL | 05/19/2021 | 01/26/2022 | COMBO | Adding a new panel to an existing distribution board on and existing breaker. Installing receptacles for 48 new shaker tables | |
T22CM05574 | WITHDRWN | 07/22/2022 | N/A | COMBO | (3) circuits from MDP to transformers & panelboards and from panelboards out to receptacles for Siemens machines |
Plans
Address: 6701 S KOLB RD
Date - 12/23/2024 12:55 p.m.
Total Number Of Plans - (1)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T18PRE0139 | PLAN CK | 12/18/2018 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS |
Record Requests
Address: 6701 S KOLB RD
Date - 12/23/2024 12:55 p.m.
Total Number Of Requests - (3)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0523-02515 | Withdrawn | 05/03/2023 | N/A | Requests | ** PROJECT OWNER WILL NOT CONDUCT WORK IN THE ROW.** BUILDING PERMIT REQUEST - PROJECT OWNER WILL NOT CONDUCT WORK IN THE ROW. |
REQ-0924-05905 | Complete | 09/03/2024 | 09/06/2024 | Requests | CONSTRUCTION IS STILL UNDERWAY. WE NEED A 90-DAY EXTENSION, PLEASE. |
REQ-1122-00103 | Complete | 11/14/2022 | 12/22/2022 | Requests | (PLEASE RENEW FOR 60 DAYS) TEP TO DIG 7' HOLE IN DIRT TO INSTALL NEW FOUNDATION POLE & 350' OF OVERHEAD WIRE. WO 6332496 1; Work Order: 6332496 |