Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0926-00248
Parcel: 123100280

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0926-00248
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/15/2026 External Reviewers - COT Parks & Recreation Standard APPROVED Approved

Regarding: TD-DEV-0926-00248, the City of Tucson Parks and Recreation Department has no additional requirements for the Project and no further reviews by TPRD are required.

Parcel: 123100280

Regards,
Joe Barr
Project Manager
Tucson Parks and Recreation
520-307-2811
10/22/2026 Site Zoning Standard APPROVED
11/09/2026 CDRC Post Review Express PENDING ASSIGNMENT
10/22/2026 Commercial Plumbing Standard REQUIRES RESUBMIT ACTIVITY NO. TD-DEV-0926-00248
ADDRESS/PARCEL: 1625 N CAMPBELL AV TUCSON, AZ 85719

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:


1. A private sewer collection system that includes manholes will require a review of the system design by the Pima County Department of Environmental Quality prior to obtaining a building permit from the City of Tucson. In addition, the Pima County Department of Environmental Quality requires the Engineer of Record to conduct specific inspections during construction. Submit the plans that have been approved by the Pima County Department of Environmental Quality for approval. Reference Title 18, R18-9-E302, 4.02 General Permit, Arizona Administrative Code.
10/27/2026 NPPO Standard REQUIRES RESUBMIT Please see site landscape comments for additional clarity on the Native Plant Preservation Plan and mitigation standards for this project.

Thank you.
Chad Keller, PLA
chad.keller@tucsonaz.gov
10/16/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0926-00248 (1st Review)
Project: Restricted Record-Expansion of Exist Parking Garage C on Banner UMC Tucson Campus
Location: 1625 N CAMPBELL AV
Review Date: 10/16/2026
Reviewer: Marco Contreras – Engineering Associate & Joe Macaulay – Civil Engineer
Reviewer Contact Information: marco.contreras@tucsonaz.gov; joe.macaulay@tucsonaz.gov

Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards.

The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files.

Applicable Code Links for quick/direct reference:
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593

Site Engineering Review Comments:
1. Provide the development package case number (TD-DEV-0926-00248) adjacent to the title block on each sheet of the plan set. [AM 2-06.4.1.B.6]
2. Provide the development package case number (TD-DEV-0926-00248) on the overall sheet title on the cover sheet G-001.
3. Provide the following general note: Retaining walls and/or screen walls referenced on this plan are to be designed by others. Elevations shown hereon are for reference only. The contractor shall confirm exact elevations. All retaining/structural walls and/or screen walls require a separate building permit and are not covered under the grading permit for this project.
a. Ensure to update plan view keynotes/callouts on Site & grading sheets to state – “To be Built under separate permit” relating to all structural and retaining walls.
4. Please revise ADA Parking Sign and Striping “Van ADA Signs” detail on sheet CS501 to show the 7’ clearance to the bottom of the Van accessible sign.
5. Please review and revise stationing on Proposed Storm Sewer profile and plan view on sheet CG201 as they do not correspond and reflect the true distances and stations shown between them.

Drainage Report Comments:
6. Summary and Conclusions Section - The report does not contain a Summary and Conclusions section as required by Drainage Manual Section 2.3.1.7. This section should be added and shall include, at minimum, the following:
a. A concise summary of all significant analyses and conclusions presented in the report, including compliance with City of Tucson first flush retention and critical basin detention requirements
b. A certification by the Engineer of Record, under seal, that the proposed drainage plan — once properly constructed — will adhere to all applicable Local, State, and Federal Floodplain Regulations
7. The report does not demonstrate drain-down compliance for the proposed basins as required by DSSDR Section 4.5. The resubmission must include a dedicated section that calculates and documents the drain-down time for each basin using results from site-specific infiltration testing. The section should showcase this drain down compliance using the results from the infiltration testing completed. (Refer to subsequent Geotechnical comment)
a. As the basins proposed show greater than 9-inches of retention volume, infiltration testing requirements apply
8. Section I (Long-Term Maintenance Responsibility) - Specify the name, address, and telephone number of the person(s), firm(s), agency or agencies responsible for the ownership, operation, scheduled and unscheduled maintenance, and liability of drainage improvements (i.e., roads, parking areas, washes, drainageways, detention/retention basins, common areas, etc.) described in the drainage report. List other documents where these responsibilities are documented (i.e., CC&Rs, Final Plats, Development Plans, etc.) [Drainage Manual 2.3.1.2.E.1]
9. Provide all City of Tucson Hydrologic Data sheets within the drainage document used for computing the 2-, 10-, & 100-year peak discharges.
a. Ensure to use the required 3-inches for the areally reduced one-hour rainfall depth for calculations found in COT Drainage Manual Table 4.1.
10. Provide an inspection and maintenance protocol including frequency of inspection, a checklist of items to be inspected and recommended maintenance when an inspection identifies a maintenance requirement and shall be prepared by an Arizona registrant. The protocol may be included in the project drainage report or prepared as a separate document. The protocol shall be reviewed and approved by the Floodplain Administrator prior to approval of the tentative plat or development plan. The protocol shall be delivered to the entity responsible for inspection and maintenance. An example of a detention basin inspection and maintenance checklist is provided in Appendix F. DSSDR 4.1.1. [Drainage Manual 2.3.1.6.C]

Geotechnical Comments:
11. Detention basins with uniform side slopes and no terraces may incorporate retention for a maximum depth of 9” below the lowest outlet elevation. The volume provided below the outlet can be counted as retention volume. If infiltration testing is provided, the retained depth may be increased. [DSSDR 2.5]
a. It will be required that infiltration testing be completed for the proposed expansion to basin #5 to demonstrate compliance with required drain down times. [DSSDR 4.5.1.1]. For resubmission, ensure to revise the geotechnical report to include this analysis. (Refer to subsequent drainage report comment for further details). It will need to be demonstrated that drain down times are compliant [DSSDR Section 4.5] If basins do not demonstrate proper drain-down, redesign will be required.
10/27/2026 Site Landscape Standard REQUIRES RESUBMIT PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, PLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: EXPANSION OF EXIST PARKING GARAGE C ON BANNER UMC TUCSON CAMPUS
ACTIVITY NO: TD-DEV-0926-00248
ADDRESS: 1625 N CAMPBELL AV
ZONING: PAD-28 BANNER - UNIVERSITY MEDICAL CENTER PAD
LAND USE: PARKING GARAGE
10.27.2026

THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING, PER-THE-CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM).

RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Provide a summary of PAD 28 landscape requirments and how they have been met. Include citation from the PAD document that explains how certain UDC, TSM and AM requirements can be deviated for flexibility. **E.G. Rainwater harvesting, The PAD District will implement rainwater harvesting, when possible, in areas with the capability to integrate such features. It is understood that these rainwater harvesting elements may or may not meet the expected percentage of supplemental irrigation per the UDC. Based on the existing conditions, the rainwater harvesting elements will be implemented where existing conditions facilitate passive water harvesting in new landscape areas.

2. It appears that there are opportunities to depress some of the new planting areas near the entry and within the parking lot tree planter islands. If feasible, can a general leader call out be added to the planting plan that states that any new planting areas shall be depressed 6 inches for rainfall only catchment rainwater harvesting.

3. The NPPO mitigation calculations include a note that PLANTS FOR MITIGATION REQUIREMENTS WILL BE INSTALLED DURING WORK BEING COMPLETED AS FUTURE DEVELOPMENT PACKAGE. It seems that the NPPO being shown in relation to this project should be incorporated into these plans. Not sure how these plants will be kept track of if they are related to some development package that happens in the future. Please advise, or clarify the intent.

4. Ring RD is a minor local road and is labeled as private on the plan set. If applicable, can the ROW lines be added for this road and call the ROW lines out on the plans.

5. Provide and label the SVTs on the planting plan.

6. Prior to site landscape approval, ensure that Site Zoning and Site Engineering comments are fully addressed.

7. Include the Activity Number TD-DEV-0926-00248 on all sheets in the plan set.

Thank you.

CHAD KELLER, PLA
LANDSCAPE ARCHITECT

CITY OF TUCSON, PDSD, SITE REVIEW SECTION
CHAD.KELLER@TUCSONAZ.GOV
520.837.4923
09/28/2026 CDRC Application Completeness Express REVIEW COMPLETED
10/05/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added PAG, USPS, SWG, and TEP to the workflow. Fyi notice sent to PAG, USPS, SWG, and TEP.
11/09/2026 Entitlements Standard REVIEW COMPLETED
10/05/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/05/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/05/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/05/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI Notice email sent. No further action is required.
10/26/2026 Fire New Construction Standard REVIEW COMPLETED
10/14/2026 MITZ District Standard REVIEW COMPLETED
09/29/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
10/01/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
10/28/2026 ROW Engineering Review Standard REVIEW COMPLETED
10/07/2026 ROW Review REVIEW COMPLETED