Permit Number: TD-DEV-0824-00236
Parcel: 140281320

Address:
6219 S SEARS BL

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW REVISION v.1

Permit Number - TD-DEV-0824-00236
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/29/2025 Site Landscape Standard APPROVED Site Landscape Comments:

1. This revision includes the adjustment of plant locations into the ROW. I have added DTM and David Marhefka, PLA to this review cycle. Please allow some extra time for DTM Landscape review. All items included in the revision that are taking place within the property limits are approved. Please reach out if you have any questions.

Thank you.
Chad Keller, RLA
chad.keller@tucsonaz.gov
09/04/2025 Transportation Landscape Review Standard APPROVED
09/02/2025 Site Engineering Standard REQUIRES RESUBMIT TD-DEV-0824-00236
6219 S SEARS BL

Site engineering comments are as follows:

1. Please include a screen wall detail which complies with PAG 109 standard detail.
2. Include a callout for PAG 109 in the notes.
3. For walls greater than 6 ft in height, or walls that retain more than 3 ft of earth, a separate permit will be required.

Ryan Insalaco
Engineering Associate
ryan.insalaco@tucsonaz.gov
Phone: (520) 837-5351
09/10/2025 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Cielo Reserve Lots 1 - 52
Development Package (Revision 2, 1st Review)
TD-DEV-0824-00236

TRANSMITTAL DATE: September 10, 2025

DUE DATE: August 29, 2025

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is August 6, 2026.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

1. COMMENT: 2-06.4.9.O – The revision letter states that the setbacks are for the garages. Clearly note that if the garage is at less than 18’ it is required to be a side entry not directly from the street. Also based on the 10’ Utility Easement shown on most lots 10’ will be as close as you can get to the street property line.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
08/04/2025 CDRC Application Completeness Express REVIEW COMPLETED
08/08/2025 CDRC Review Coordinator Express REVIEW COMPLETED NO EXTERNAL REVIEWERS
External Reviewers not required. No further action is required from the customer at this time.
08/27/2025 Fire New Construction Standard REVIEW COMPLETED
08/07/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
08/07/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
08/12/2025 TW New Development Review REVIEW COMPLETED Tucson Water has no objections to this Development Package or the Proposed Revision.