Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: In Review
Review Details: DEVELOPMENT PACKAGE NEW v.3
Permit Number - TD-DEV-0824-00231
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: In Review
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
N/A | CDRC Post Review Express | PENDING ASSIGNMENT | |||
N/A | Entitlements | PENDING ASSIGNMENT | |||
N/A | External Reviewers - Tucson Electric Power (TEP) | PENDING ASSIGNMENT | |||
N/A | NPPO | PENDING ASSIGNMENT | |||
N/A | ROW Engineering Review | PENDING ASSIGNMENT | |||
N/A | Site Landscape | PENDING ASSIGNMENT | |||
N/A | Site Zoning | PENDING ASSIGNMENT | |||
01/24/2025 | Site Engineering | REQUIRES RESUBMIT | 1. A separate SWPPP sheet is required in the plan set that shows the locations of the BMPs with details. 2. Drainage Statement: Thank you for updating the Q calculations for DON-4 on the Hydrologic Data Sheets. It appears that BASIN 1 INFLOW has been updated to reflect the increase in contributing flow from DON-4. However, it appears the routing calculations have not been updated as they show, for example, Q100=24.1cfs when the updated value is 24.7cfs. The Qs for DON-4 and downstream have not been updated on the watershed maps for the improvement plan. Figures 4 and 5 are mislabeled (switched). The watershed maps are listed under Fig 5 but labeled Fig 4, and vice versa for the La Escalera - Phase I drainage report excerpts. Please run the updated routing calculations and update the figures accordingly for consistency throughout the report. Mike Ortiz michael.ortiz@tucsonaz.gov |