Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW REVISION v.3
Permit Number - TD-DEV-0823-00376
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/24/2026 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 06/24/2026 | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| 06/24/2026 | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| 06/24/2026 | NPPO Standard | PENDING ASSIGNMENT | |||
| 06/24/2026 | ROW Engineering Review Standard | PENDING ASSIGNMENT | |||
| 06/24/2026 | Site Engineering Standard | PENDING ASSIGNMENT | |||
| 06/24/2026 | Site Landscape Standard | PENDING ASSIGNMENT | |||
| 06/24/2026 | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 06/22/2026 | OK to Submit - Engineering Fast | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0823-00376 (OK To Submit Review) Project: Rev 1 - Update to fence, started 05.01.2026 ** Multifamily expansion adding a community center and additional unit. We've been working with Pat Tapia and Andy Vera on the trash pick-up location as shown on plan. Location: 2937 N FLANWILL BL Review Date: 6/22/2026 Reviewer: Marco Contreras – Engineering Associate Reviewer Contact Information: marco.contreras@tucsonaz.gov Related cases: Plan review for the above-referenced development package has been completed. This review was conducted for compliance with applicable development criteria including the City of Tucson Unified Development Code (UDC), Administrative Manual (AM) Section 2-6, and Technical Standards Manual (TSM) sections governing waste management, pedestrian access, hydrology – retention/detention requirements, and all applicable site standards. The following comments must be addressed prior to approval. To help facilitate a timely resubmittal, please provide updated plans and calculations along with a written response to each comment, indicating what action was taken and where the change can be found on the plans. Do not use revision clouds on resubmittal drawings — clouds are reserved for post-permit revisions only. Submit your response letter and updated plan set & reports as separate files. Applicable Code Links for quick/direct reference: City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf City of Tucson Chapter 25: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-18593 Site Engineering Application Completeness Review Comments: 1. Application incomplete, previous comment 1.b not addressed, please provide the following for resubmission: a. A revision to the drainage report will be required to include proper flood venting requirements and analysis. Please provide a drainage addendum to the existing report that includes applicable flood venting calculations and applicable venting analysis. |
||
| 06/24/2026 | OK to Submit - Zoning Fast | REQUIRES RESUBMIT | 1. Address Site Engineering comment. Loran Shamis loran.shamis@tucsonaz.gov |