Permit Number: TD-DEV-0725-00197
Parcel: 14103036B

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0725-00197
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/26/2025 Entitlements Standard REQUIRES RESUBMIT Rezoning case number TP-ENT-1023-00038 and the conditions of approval must be included in notes section.
08/29/2025 NPPO Standard REQUIRES RESUBMIT See Site Landscape review comments.

Thank you.
Chad Keller, RLA
chad.keller@tucsonaz.gov
08/07/2025 ROW Engineering Review Standard REQUIRES RESUBMIT TD-DEV-0725-00197 • 6991 E OLD VAIL RD

1. Depict and label existing the roadway infrastructure along Valencia Rd.

2. Depict and label existing and future right-of-way.

3. Sheet 3, Detail F/3: depict ROW limits and any existing drainage infrastructure within the ROW.

If you have any questions on these comments, please contact Richard Leigh at 520-403-0970 or at richard.leigh@tucsonaz.gov.
08/21/2025 Site Engineering Standard REQUIRES RESUBMIT Permit: TD-DEV-0725-00197
Location: 6991 E OLD VAIL RD
Review Date: 8/21/2025
Site Engineering Comments:
1. The use of APCs for multi-family, commercial, or industrial development requires prior approval from Environmental services TSM 8-01.4. G
2. Provide Basin dimensions on grading sheet
3. Revise plans to show the erosion protection extending below the finished grade of the basin floor for both inlets of the basin. DSSDR 4.8.1.5

If you have any questions or concerns, please contact
Marco Contreras
Marco.contreras@tucsonaz.gov
08/29/2025 Site Landscape Standard REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: OLD VAIL ROAD RV STORAGE
ACTIVITY NO: TD-DEV-0725-00197
ADDRESS: 6991 E OLD VAIL RD
ZONING: I-1 INDUSTRIAL ZONE
LAND USE: MULTI-UNIT STORAGE

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape and NPPO Section review comments have been addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Include all applicable landscape plans as indicated on the sheet index. If necessary, state any cross referencing required between approved plan set DP21-0034 and this phase of the DP.

2. Provide the development package case number, TD-DEV-0725-00197, adjacent to the title block on all site landscape sheets, per Administrative Manual 2-06.4.3

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
08/27/2025 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Jeffrey W. Cassidy, Planner
Planning & Development Services Department – Current Zoning Review Section

PROJECT: TD-DEV-0725-00197– Commercial – Old Vail Rd RV Storage
6991 E Old Vail Rd Tucson, AZ 85756 (L-1 Zoning)
Development Package Review – 1st Review

TRANSMITTAL DATE: August 27, 2025

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is July 29, 2026.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

2-06.3.0 FORMAT REQUIREMENTS

2-06.3.12 - An index of sheets in the development package shall be provided on the first sheet.

1. COMMENT:
Per the 2-06.3.12 standard, only the first four sheets were submitted. Sheets 5 thru 10 are missing and need to be included.

2-06.4.0 CONTENT REQUIREMENTS

2-06.4.2 - The title block shall include the following information and be provided on each sheet:

2-06.4.2.B - A brief legal description and a statement as to whether the project is a re-subdivision are to be provided. On re-subdivisions, provide the recording information of the existing subdivision plat;

2. COMMENT:
Per the 2-06.4.2.B standard, provide missing legal description on the CS01 sheet.

2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet xx of xx).

3. COMMENT:
Per the 2-06.4.2.D standard, and the sheet index, there appear to be ten sheets. The four sheets provided currently say ‘x of 4’. Correct this to say ‘x of 10’ on each sheet. Add sheet names and sheet labels (ie CS1.0) into each title block. ie Landscape Plan, Irrigation Plan, etc., for all ten sheets listed in the sheet index.

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

4. COMMENT:
Provide the development package case number, TD-DEV-0725-00197, and relevant case number TP-ENT-1023-00038 adjacent to the title block on each sheet.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2-06.4.7.A.3 - If the plan/plat has been prepared in conjunction with a rezoning application, add the following note next to the existing zoning note: "Proposed zoning is ____." List the applicable rezoning file number and conditions of approval. Also place the C9-__-__ (if applicable) and the plan/plat file numbers in the lower right corner of each sheet.

5. COMMENT:
Per the 2-06.4.7.A.3 standard, add the Proposed Zoning is L-1, the applicable rezoning file number TP-ENT-1023-00038 and conditions of approval in the general notes section.

2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

6. COMMENT:
Per the 2-06.4.7.A.4 standard, add existing use for parcel 141-03-036B as Undeveloped Land.

2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan.

7. COMMENT:
Per the 2-06.4.7.A.6 standard, add TP-ENT-1023-00038 and Gateway Corridor Zone (GCZ). Fix the spelling of Routes (in MS&R) and change AZE to AEZ on General note #19 / sheet CS1.0. Additionally, while MS & R is acknowledged in general note #19 / sheet CS1.0, it is not acknowledged neither existing nor future (see ROW review comment #2).

2-06.4.7.A.6.a - List additional applications and overlays, by case number (if applicable), in lower right corner of each sheet. As a general note provide the type of application processed or overlays applicable, a statement that the project meets the criteria/conditions of the additional application or overlay, the case number, date of approval, what was approved, and the conditions of approval, if any.

8. COMMENT:
Refer to Comment #7.

2-06.4.7.A.6.b - If there is more than one lot within the site, the note should specify which lots are affected by the additional applications or overlay zones.

9. COMMENT:
Per the 2-06.4.7.A.6.b standard, provide missing note.

2-06.4.7.A.8 - For development package documents provide:

2-06.4.7.A.8.c - Percentage of building, lot area, or vehicular use area expansion. If the building(s) or lot area have been previously expanded, those calculations shall be included; and,

10. COMMENT:
Per the 2-06.4.7.A.8.c standard, provide missing information for both parcels and separate out to make clear.

2-06.4.7.A.8.d - When the proposed site is part of a larger site, the calculations encompass the entire site, whether existing or proposed. If the project is being phased, calculations must show that, at each phase, requirements are being met.

11. COMMENT:
Per the 2-06.4.7.A.8.d standard, provide missing information. Per the phasing, as Phase 1 is now complete, remove reference to Phase 1 and update Phase 2 to now be Phase 1 and Phase 3 to now be Phase 2. Clarify inconsistent phasing labels on the plan graphic on sheet CS1.0 not matching the phasing notes in general note #20. Graphically depict overhead canopies, label and clarify and acknowledge heights of canopies. General Note #14 / Sheet CS1.0 states a different canopy height than sheet 4 of 4. Add canopy details to detail sheet communicating height and demonstrating compliance with PAAL setback per 7.4.6.E.2 and 7.4.6.F.2.b.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.G - If the project is to be phased, provide calculations, setbacks, etc., to indicate that each phase complies with all requirements as a separate entity. Show phase lines on the drawing. Show and label any temporary improvements that may be needed to make the site function for each phase as one entity. If such temporary improvements are off the site of the phase under consideration, a temporary easement or other legal documentation to assure legal use of the property is required. Note recording information.

12. COMMENT:
Refer to Comment #11.

2-06.4.9.H - Proposed Traffic Circulation

2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

13. COMMENT:
Refer to Comment # 11.

2-06.4.9.H.6 - If the project is phased, the phase under consideration shall be designed so those later phases are assured legal access. If such access is provided through the phase under consideration, public streets are required, or access easements must be delineated and dedicated for such use. If private easements are utilized, protective covenants establishing the right of access, maintenance and incorporation of future phases into this project are required.

14. COMMENT:
Per the 2-06.4.9.H.6 standard, describe in the general notes how access will be addressed via the phasing described.

2-06.4.9.U - Indicate graphically, where possible, compliance with conditions of rezoning.

15. COMMENT:
Per the 2-06.4.9.U standard, provide missing graphic and label.

16. COMMENT:
Additional comments may be forthcoming on the next review based on responses to Zoning and other the PDSD reviewer comments

If you have any questions about this transmittal, please contact jeffrey.cassidy@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
07/30/2025 CDRC Application Completeness Express REVIEW COMPLETED
08/04/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added TAA, TEP, SWG USPS, and PAG to the workflow. Review request email sent to TEP and TAA. FYI email sent to, SWG USPS PAG.
08/25/2025 Commercial Plumbing Standard REVIEW COMPLETED
08/04/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/04/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/13/2025 External Reviewers - Tucson Airport Authority Standard REVIEW COMPLETED August 13, 2025
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0725-00197, 1
st Submittal, Old Vail Road RV Storage / 6991 E. Old Vail Rd,
Tucson, AZ. 85756, Received August 4, 2025
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0725-00197, 1
st Submittal, a
development plan for new recreational vehicle parking lot at 6991 East Old Vail Road. This
development is located in the N.E. quarter of the S.E. quarter of Section 7, Township 15S,
Range 15E, of the Gila and Salt River Meridian. The development site occupies parcel number
141-03-036B, covers approximately 8.68 ± acres, and is zoned as Suburban Ranch Zone (SR)
but is being rezoned to be Light Industrial Zone (I-1). The nearest major roadway intersection is
East Valencia Road and South Kolb Road, approximately 1,075 feet to the northeast of the
subject development.
The Tucson Airport Authority approves the proposed project and is not requiring a resubmittal of
this project.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
cc file
08/14/2025 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
August 13, 2025
WO#T158908
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Old Vail Road RV Storage
TD-DEV-0725-00197
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 8/4/2025. There are existing facilities within the development which are
depicted upon the plan. There are TEP facilities on or near the site. The TEP facilities
should be protected in place.If the TEP facilities need to be removed/relocated, it will be
at the developer's expense.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Cruz Vega
(520) 349-9850
cruzvega@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
08/04/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/20/2025 Fire New Construction Standard REVIEW COMPLETED
08/01/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
07/31/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
08/05/2025 ROW Review REVIEW COMPLETED