Permit Number: TD-DEV-0725-00184
Parcel: 14039052F

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0725-00184
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/18/2025 External Reviewers - Tucson Electric Power (TEP) Standard REQUIRES RESUBMIT 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
August 18, 2025
WO#T157739
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: LRSC Multipurpose
TD-DEV-0725-00184
Tucson Electric Power Company (TEP) has reviewed and cannot approve the
development plan submitted 7/23/2025. There are existing facilities within the
development which are not depicted upon the plan. There are TEP facilities on site that
are not shown in the plans. Please add in TEP facilities and resubmit request.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Cruz Vega
(520) 349-9850
cruzvega@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
08/15/2025 NPPO Standard REQUIRES RESUBMIT See site landscape comments for NPPO requirements.

Thank you.
Chad Keller, RLA
chad.keller@tucsonaz.gov
08/19/2025 Site Engineering Standard REQUIRES RESUBMIT 1. Include the waste stream calculations for solid waste and recycling for the site on the plans.
2. Show the slope compliance on the grading sheet for the trash enclosure concrete slab and ramp at 1% toward the gate and 2% away from the gate respectively.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
08/15/2025 Site Landscape Standard REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: NEW MULTI-PURPOSE FACILITY
ACTIVITY NO: TD-DEV-0725-00184
ADDRESS: 5300 E LOS REALES RD
ZONING: PAD-4 LOS REALES PAD

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape and NPPO Section review comments have been addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Provide a full set of site landscape plans including a commercial rainwater harvesting plan and calculations. Ensure that all requirements set forth in the PAD 14 document for landscape requirements are included and outlined on the landscape plans.

2. A 30% set aside and an Environmental Resource Report were completed as part of the PAD-14 requirements for Native Plant Preservation. Reference this information from the PAD document on the cover sheet of the landscape plans.

3. Provide the development package case number, TD-DEV-0725-00184, adjacent to the title block on all site landscape sheets, per Administrative Manual 2-06.4.3

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
08/18/2025 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

TO:
Development Services Department
Plans Coordination Office

FROM:
Fernando Garcia
PDSD Zoning Review Section

PROJECT:
Development Package
5300 E Los Reales Rd, Bldg 4, Tucson, AZ 85756
TD-DEV-0725-00184 (1st Review)

TRANSMITTAL DATE: August 18, 2025

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is , 20 .

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)


2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

1. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-0725-000184, adjacent to the title block on each sheet.


2-06.4.6 - If the project is located within the boundaries of a Planned Area Development (PAD) zone, include a reduced-scale map of the PAD on the first sheet, indicating the location of the portion being developed.

2. COMMENT: 2-06.4.6 – Demonstrate the area covered by the PAD 14 document on the key plan, or on a separate map.


2-06.4.7.A.8.b - Percentage and area in square feet of building and accessory building coverage;

3. COMMENT: 2-06.4.7.A.8.b – Provide requested information.


2-06.4.7.A.8.c - Percentage of building, lot area, or vehicular use area expansion. If the building(s) or lot area have been previously expanded, those calculations shall be included; and,

4. COMMENT: 2-06.4.7.A.8.c - Provide requested information.


2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

5. COMMENT: 2-06.4.9.H.5.a - The building gross floor area in the parking calculations table states 9,823 sf and 11,463 sf. Clarify the actual building gross floor area.


2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided.

6. COMMENT: 2-06.4.9.H.5.d – The current PAD 14 document, in section C-6.c., indicates that bicycle parking requirements will be per the Land Use Code (LUC). The LUC is now the UDC and under the LUC, an administrative and professional office use requires at minimum two long-term bicycle parking spaces. The parking calculations table indicates that none are required. Correct this calculation and show on plans where the long-term bicycle parking will be provided.


If you have any questions about this transmittal, contact Site Zoning Reviewer Fernando Garcia at fernando.garcia2@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
07/16/2025 CDRC Application Completeness Express REVIEW COMPLETED
07/23/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added TEP, TAA, ADOT and ENT , SWG USPS, and PAG to the workflow. Review request email sent to TEP, TAA, ADOT and ENT. FYI email sent to, SWG USPS PAG.
08/13/2025 Commercial Plumbing Standard REVIEW COMPLETED
08/22/2025 Entitlements Standard REVIEW COMPLETED
08/05/2025 External Reviewers - Arizona Department of Transportation (ADOT) Standard REVIEW COMPLETED ADOT SC Traffic Engineering - ADOT
​CDRC​
Good Afternoon,

ADOT has no comments on this DEV.

Thank you for the opportunity to review.
07/23/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/19/2025 External Reviewers - Pima County Addressing Standard REVIEW COMPLETED Good afternoon,



Pima County Addressing approves TD-DEV-0725-00184.



Nicholas Jordan

Site Review Project Manager II – Addressing Official

Pima County Development Services Department

201 N Stone AV – 1st Floor

Tucson, AZ 85701

(520) 724-9623
07/23/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/07/2025 External Reviewers - Tucson Airport Authority Standard REVIEW COMPLETED August 5, 2025
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0725-00184, 1
st Submittal, New Multi-Purpose Facility, 5300 E Los Reales Rd,
BLDG 4, Tucson, AZ. 85756, Received July 23, 2025
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0725-00184, 1
st Submittal, a
development package for a new multipurpose building at 5300 E Los Reales Rd. This
development is located in the S.E quarter of the S.E. quarter of Section 14, Township 15S,
Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel number
140-39-052F, covers approximately 45.42 ± acres, and is zoned as Planned Area Development
14 (PAD-14). The nearest major roadway intersection is East Los Reales Road and South
Craycroft Road, approximately 1,400 feet to the southwest of the subject development.
This site does lie within the Tucson International Airport avigation easement requirements and
public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
The Tucson Airport Authority approves the project and is not requiring a resubmittal of this
project.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
cc file
07/23/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/11/2025 Fire New Construction Standard REVIEW COMPLETED
07/21/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
07/21/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
07/23/2025 ROW Engineering Review Standard REVIEW COMPLETED DTM ROW Engineering has no comments.