Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0723-00335
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/07/2023 | Commercial Plumbing | APPROVED | |||
08/22/2023 | NPPO | APPROVED | |||
09/06/2023 | ROW Engineering Review | APPROVED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
||
09/07/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
09/05/2023 | External Reviewers - COT Environmental Services | REQUIRES RESUBMIT | ES comments are as follows: Sheet 1, Solid Waste – Waste Stream Calculations, Recommended use – Include note clarifying shared use with one responsible party for the management of the solid collection services. Refer to TSM 8-01.5.1.D. Sheet 2 & 6, Must include provisions for both trash and recycle storage. Either add one single container enclosure or modify existing single to a double container enclosure. Refer to TSM 8-01.1.0, 8-01.4.C, & 8-01.9.0 Figure 3A Feel free to contact me regarding any questions with this review. Thanks, Andy Vera City of Tucson -Environmental Services Accounts Representative Supervisor (520) 837-3798 |
||
09/06/2023 | Site Engineering | REQUIRES RESUBMIT | 1. Provide proof of abandonment of alley. 2. Plat required to create parcels shown on DP. 3. All current easements being abandoned to be done by other instrument prior to resubmittal 4. Cross Access agreement missing exhibit B. See environmental services comments. Joshua Garcia joshua.garcia@tucsonaz.gov |
||
08/22/2023 | Site Landscape | REQUIRES RESUBMIT | ACTIVITY NO. TD-DEV-0723-00335 PROJECT: 2 COMMERCIAL BUILDINGS & FUEL STATION ADDRESS/PARCEL: 405 W SPEEDWAY BL ZONING: C-3 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed. COMMENTS: 1. Ensure that Zoning, Engineering comments, and concerns are addressed prior to landscape section approval. 2. Provide the development package case number, TD-DEV-0723-00335, adjacent to the title block on all sheets. 2-06.4.3 3. Include spot elevations on the landscape plan for the water harvesting basins. 4. If using d.g at a 2” depth, ensure the rainwater harvesting basins are 8” possible in depth to account for the d.g. 5. Show all curb cuts/downspouts/splash pads on the commercial rainwater harvesting plan. 6. Include directional arrows for all roofs on the commercial rainwater harvesting plan. If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988 |
||
08/08/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Chevron/Tropical Smoothie Development Package (1st Review) TD-DEV-0723-00335 TRANSMITTAL DATE: August 8, 2023 DUE DATE: September 2, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is July 26, 2024. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0723-00335, adjacent to the title block on all sheets. 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 2. COMMENT: 2-06.4.8.B – All existing easements slated to be abandoned shall be abandoned prior to approval of this plan. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 3. COMMENT: 2-06.4.9.E – As it appears that some type of land split/plat is proposed this process shall be approved prior to approval of this plan. 4. COMMENT: 2-06.4.9.I – The proposed vacation of the alley shall be completed prior to approval of this plan. Provide the recorded documentation. 5. COMMENT: 2-06.4.9.L – All proposed easements shall be recorded prior to approval of this plan. 6. COMMENT: 2-06.4.9.O – The street setbacks listed under Setbacks, Landscape Boarders and Screening are not correct. Review the amended UDC and provide the correct street perimeter yard setbacks. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter. |
||
07/27/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
07/31/2023 | CDRC Review Coordinator | REVIEW COMPLETED | Added external reviewers, sent emails and sent FYI emails per SOP. | ||
08/25/2023 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | [EXTERNAL] Re: DUE SEPTEMBER 2, 2023 / 2 new commercial buildings and fuel station / TD-DEV-0723-00335 Jay Gomes <jgomes@azdot.gov> CDRC Gregory Orsini Good Afternoon, Although not in ADOT R/W, it appears this development may impact Speedway Blvd. and the signalized intersection with Main Ave. It is recommended that the City of Tucson Department of Mobility assess the traffic impacts of this new facility. Thank you for the opportunity to review this DEV. |
||
07/31/2023 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
07/31/2023 | External Reviewers - Southwest Gas | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
07/31/2023 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
07/31/2023 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | Sent FYI emails per SOP. | ||
08/14/2023 | Fire New Construction | REVIEW COMPLETED | |||
07/27/2023 | OK to Submit - Engineering | REVIEW COMPLETED | |||
07/27/2023 | OK to Submit - Landscape | REVIEW COMPLETED | |||
07/27/2023 | OK to Submit - Zoning | REVIEW COMPLETED |