Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-0723-00309
Parcel: 30501005A

Address:
10000 S RITA RD

Review Status: Approved

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0723-00309
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
04/25/2024 External Reviewers - Tucson Electric Power (TEP) APPROVED April 25, 2024
WO#T110417
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Roadrunner Reserve #2
TD-DEV-0723-00309
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 4/1/2024. There are existing facilities which are depicted upon the plan.
There are multiple crossing of underground and overhead TEP lines. All TEP lines shall
be protected in place and appropriate clearances from overhead and underground lines
shall be maintained.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Cruz Vega
(520) 349-9850
cruzvega@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
04/24/2024 NPPO APPROVED
04/02/2024 Site Engineering APPROVED
04/24/2024 Site Landscape APPROVED
04/04/2024 Site Zoning APPROVED
03/21/2024 CDRC Application Completeness Express REVIEW COMPLETED
04/25/2024 CDRC Post Review Express REVIEW COMPLETED
04/01/2024 CDRC Review Coordinator Express REVIEW COMPLETED Per Reviewers, TEP review required. CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
04/01/2024 External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
04/01/2024 External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
04/01/2024 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
04/05/2024 Fire New Construction REVIEW COMPLETED
03/25/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
03/27/2024 OK to Submit - Landscape Fast REVIEW COMPLETED
03/27/2024 OK to Submit - Zoning Fast REVIEW COMPLETED