Permit Number: TD-DEV-0723-00309
Parcel: 30501005A

Address:
10000 S RITA RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0723-00309
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/23/2023 Commercial Plumbing APPROVED
08/14/2023 External Reviewers - Tucson Airport Authority APPROVED August 13, 2023
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0723-00309, TEP Vail Substation BESS Upgrades / 10000 S Rita Rd, Tucson, AZ
85747, Received July 25, 2023
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0723-00309, the development plan for
the TEP Vail Substation and BESS Upgrades at 10000 S Rita Rd. This development is located
in the N.E. quarter, the N.W. quarter, the S.E quarter, and a small portion in the S.W. quarter of
Section 4, Township 16S, Range 15E, of the Gila and Salt River Meridian. The development site
occupies parcel number 305-01-005A, covers approximately 200.05 ± acres, and is presently
zoned as Rural Homestead Zone (RH) but will be rezoned to Heavy Industrial Zone (I-2) as part
of City of Tucson rezoning case TP-ENT-0323-00018. The nearest major roadway intersection
is Old Vail Connection Road and South Rita Road, approximately 0.40 miles to the northeast of
the subject development.
This site does lie within the Tucson International Airport avigation easement requirements and
public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
The Tucson Airport Authority approves the proposed project and is not requiring a resubmittal.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
08/08/2023 NPPO APPROVED
08/08/2023 Site Landscape APPROVED
08/11/2023 Traffic Engineering Review APPROVED
08/23/2023 CDRC Post Review Express PENDING ASSIGNMENT
08/17/2023 Fire New Construction REQUIRES RESUBMIT -Provide location of hydrant (s) and distance to the facility as the hose lays.
john.vincent@tucsonaz.gov
5203495581
08/09/2023 Site Engineering REQUIRES RESUBMIT 1. Show in the body of the drainage report how the 15% reduced peak flow from existing conditions is achieved
2. Label the basin top elevations, ensure 6" of freeboard (12" with embankment) from WSEL to top
3. In-lieu of alternative surfacing requirements per UDC 7.4.6, include header curbs to contain gravel along access drive
4. A perc test will be required prior to issuance of this permit to confirm the retention depth viability

Scott Haseman
scott.haseman@tucsonaz.gov
07/25/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: TEP Vail Substation – 10000 S. Rita Rd.
Development Package (1st Review)
TD-DEV-0723-00309

TRANSMITTAL DATE: July 25, 2023

DUE DATE: August 20, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is July 19, 2024.

CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0723-0039, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. COMMENT: 2-06.4.7.A.3 – Provide the rezoning case number, TP-ENT-0323-00018, adjacent to the title block on sheets 14-19.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

3. COMMENT: 2-06.4.9.H.5.a – The vehicle parking space calculation is not correct and should show 2 required.

4. COMMENT: 2-06.4.9.U - Indicate graphically, where possible, compliance with conditions of rezoning.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter.
07/14/2023 CDRC Application Completeness Express REVIEW COMPLETED
07/25/2023 CDRC Review Coordinator Express REVIEW COMPLETED Added external reviewers, sent emails and sent FYI emails per SOP.
07/28/2023 External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED [EXTERNAL] Re: DUE AUGUST 20, 2023 / TEP Vail Subsation BESS Upgrades / TD-DEV-0723-00309

Jay Gomes <jgomes@azdot.gov>
CDRC
Good Morning,

ADOT has no comments on this DEV.

Thank you for the opportunity to review.
08/08/2023 External Reviewers - COT Parks & Recreation REVIEW COMPLETED Request for 1st Submittal Review: TD-DEV-0723-00309/ TEP Vail Substation BESS Upgrades

Tom Fisher
CDRC
On behalf of the City of Tucson Parks and Recreation Department, I have no comments on the above development plan.

Tom Fisher
Project Manager
City of Tucson Parks and Recreation Department
900 S. Randolph Way
Tucson, Arizona 85716
(520) 837-8037
07/25/2023 External Reviewers - Pima Association of Governments REVIEW COMPLETED Sent FYI emails per SOP.
07/25/2023 External Reviewers - Southwest Gas REVIEW COMPLETED Sent FYI emails per SOP.
07/25/2023 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Sent FYI emails per SOP.
07/25/2023 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED Sent FYI emails per SOP.
07/14/2023 OK to Submit - Engineering Fast REVIEW COMPLETED
07/17/2023 OK to Submit - Landscape Fast REVIEW COMPLETED
07/20/2023 OK to Submit - Zoning Fast REVIEW COMPLETED