Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0625-00172
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/01/2025 | Site Zoning Standard | APPROVED | |||
| 07/31/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | The maximum distance between cleanouts in a 4” building sewer shall be 100-feet, measured along the developed pipe length from the upstream entrance of the cleanout. Reference: Section 708.1.1, IPC 2018. | ||
| 07/25/2025 | External Reviewers - Tucson Airport Authority Standard | REQUIRES RESUBMIT | July 25, 2025 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0625-00172, West Coast Data Center and Future Building, 1151 E Hermans Rd, Bldg 919, Tucson, AZ. 85756, Received July 9, 2025 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0625-00172, the development plan for a two new buildings. This development is located in the S.W. quarter and the S.E. quarter of Section 19, Township 15S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel numbers 140-43-013B and 140-43-013D, covers approximately 8.427 ± acres, and is zoned as Heavy Industrial Zone (I-2). The nearest major roadway intersection is South Nogales Highway and East Hermans Road, approximately 1000 feet to the southeast of the subject development. This site does lie within FAA Part 77 airspace. Below are the responses the FAA Pre-Screening Tool generated for this project: 1. Based on the information you provided, you are required to file notice with the FAA. You must submit notice at least 45 days before the start of the proposed construction or alteration or the date an application for a construction permit is filed, whichever is earliest. 2. Note: If you propose construction or alteration that is subject to the licensing requirements of the Federal Communications Commission (FCC), you must submit notice to the FAA on or before the date that an application is filed with the FCC. Visit FCC Licensing to learn more. The Tucson Airport Authority is requiring a resubmittal of this project to include the below condition. 1. “According to the Federal Aviation Administration (FAA) Pre-Screening Tool, this project area is located on an airport. As this project develops, all applicants must file FAA Form 7460 with the FAA at least 45 days before construction activities begin unless FAA staff, with the Obstruction Evaluation / Airport Airspace Analysis (OE/AAA), provides the project applicant with written communication that filing FAA Form 7460 is not required. It is highly recommended that the applicant file earlier than 45 days to provide the applicant with sufficient time to respond to any concerns identified by the FAA. Note also that cranes to be used during all development or construction activities must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp.” Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning cc file |
||
| 07/28/2025 | Fire New Construction Standard | REQUIRES RESUBMIT | -Correct the IFC code edition, sheet G1.S1 (applicable codes). COT/TFD adopted the 2024 IFC. -New building 919 exceeds 30' height which requires aerial fire apparatus access roads. Provide all requirements for aerial access per IFC appendix D105. This is also required for the future buildings. -Provide building construction types for future buildings to determine fire flow requirements per IFC appendix B, table B105.1(2). It's possible you will need more than one fire hydrant. -Future buildings do not appear to have hydrant coverage. IFC 507.5.1, fire hydrant shall be located within 600' of all exterior portions of the building. Show all hydrants and distances to furthest point of the buildings. You may be required to add an additional hydrant to meet the required distance. -Fire apparatus access roads shall extend to within 150' of all portion of the buildings. The north side of the future buildings do not seem to be accessible within the 150' because of the water harvesting basins. john.vincent@tucsonaz.gov 5203495581 |
||
| 07/31/2025 | NPPO Standard | REQUIRES RESUBMIT | See Site Landscape comments for additional NPPO information. Thank you. Chad Keller, RLA chad.keller@tucsonaz.gov |
||
| 08/05/2025 | Site Engineering Standard | REQUIRES RESUBMIT | 1. Include the waste stream calculations on the plans for the expansion per Technical Standards Manual (TSM) section 8-01.8. 2. Per TSM section 8-01.9 figure 3B the concrete ramp should be sloped at 2% away from the enclosure, grading sheet C2.S1 shows 1.17% slope. Revise as needed. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 07/31/2025 | Site Landscape Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: NEW DEVELOPMENT PLAN ON THE RAYTHEON CAMPUS ACTIVITY NO: TD-DEV-0625-00172 ADDRESS: 1151 E HERMANS RD ZONING: I-2 INDUSTRIAL ZONE This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape and NPPO Section review comments have been addressed. SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. Update all references to the LUC with the applicable UDC sections in the general notes. 2. Add a simple summary of the preserve in place, transplants and required mitigation plants to the NPPO. Possibly include these numbers on the planting plan for clear contractor and inspector(s) coordination. EXAMPLE SUMMARY: NATIVE PLANT PRESERVATION PLAN SUMMARY A.) THIS SITE CONTAINS TWENTY-ONE (21) VIABLE PROTECTED NATIVE PLANTS WITHIN THE PARCEL LIMITS. B.) THERE ARE THREE (03) NATIVE PLANTS PRESERVED ON SITE: (03) PROSOPIS VELUTINA C.) THERE ARE FIVE (05) TRANSPLANTS ON SITE: (01) PROSOPIS VELUTINA (03) FEROCACTUS WISLIZENII (01) FOUQUIERIA SPLENDENS D.) THERE ARE TWENTY-THREE (23) PLANTS REQURED FOR MITIGATION OF TRANSPLANTED OR REMOVED PLANTS: (19) PROSOPIS VELUTINA (03) FEROCACTUS WISLIZENII (01) FEROQUIERIA SPLENDENS 3. Include a construction detail showing root barriers for trees located near hardscape areas. See Detail 402 located here: https://www.tucsonaz.gov/Departments/Transportation-Mobility/Landscape/Landscape-Architects 4. Add a general note to the CRWHP that refers to the civil grading plan for all drainage schemes and basin construction including slopes, spot elevations, contouring, curb cuts, downspouts, splash pads, scuppers, etc. As a standard practice, add a few spot elevations on the CRWHP at the bottom of basins and basin curb cut inlets and outlets that match the civil grading plan. A few spot elevations, (BOLD LETTERING), in key locations as a quick reference for the contractor and inspectors. 5. Provide the development package case number, TD-DEV-0625-00172, adjacent to the title block on all site landscape sheets, per Administrative Manual 2-06.4.3 Thank you. Chad Keller, RLA Landscape Architect chad.keller@tucsonaz.gov 520.837.4923 |
||
| 07/01/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 07/09/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added TAA, ADOT, Addressing, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to TAA, ADOT, Addressing, and TEP. FYI email sent to PAG, USPS, SWG. | ||
| 07/21/2025 | External Reviewers - Arizona Department of Transportation (ADOT) Standard | REVIEW COMPLETED | Good Afternoon, ADOT has no comments on this DEV. Thank you for the opportunity to review. |
||
| 07/09/2025 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 08/19/2025 | External Reviewers - Pima County Addressing Standard | REVIEW COMPLETED | Good evening, Pima County Addressing approves TD-DEV-0625-00172. Nicholas Jordan Site Review Project Manager II – Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
||
| 07/09/2025 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 07/29/2025 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | 4350 E. Irvington Road Post Office Box 711, Tucson, AZ 85702 July 29, 2025 WO#T156632 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: West Coast Data Center and Future Building TD-DEV-0625-00172 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 7/9/2025. There are no existing facilities within the development.There does not appear to be any TEP facilities within the construction boundaries of the new development. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Cruz Vega (520) 349-9850 cruzvega@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 07/09/2025 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 07/07/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 07/08/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 07/15/2025 | ROW Engineering Review Standard | REVIEW COMPLETED | DTM ROW Engineering has no comments. |