Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW REVISION v.1
Permit Number - TD-DEV-0624-00169
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/16/2025 | Site Landscape | APPROVED | |||
01/21/2025 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
01/16/2025 | Commercial Plumbing | REQUIRES RESUBMIT | An approved development plan is not to be used for construction or modification of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, etc.). The construction of the on-site utilities may be included with the permit for constructing the building or as a separate permit. Remove any notes relating to how the site utilities are to be constructed | ||
01/21/2025 | Site Engineering | REQUIRES RESUBMIT | TD-DEV-0624-00169 6105 E BROADWAY BL Site engineering comments are as follows: 1. Please revise waste enclosure aprons and apparatus’ clear space to meet standards set forth in TSM Sec 8. Enclosure aprons and 14ft x 40ft clear space shall slope away from the enclosure at a minimum of 2%. 2. Show roof drain downspouts and ensure that stormwater from the 10-year event does not flow over any ADA accessible pedestrian circulation. TSM 7-01.4.3E. 3. Address Zoning and Commercial Plumbing’s comments, as well. Ryan Insalaco – ryan.insalaco@tucsonaz.gov |
||
01/17/2025 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: McDonald’s Rebuild - 6105 E. Broadway Blvd. Development Package (1st Revision, 1st Review) TD-DEV-0624-00169 TRANSMITTAL DATE: January 17, 2025 DUE DATE: January 17, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is June 19, 2025. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. COMMENT: 2-06.4.9.H.5.a – Based on the handrails called out under Keynote 27 clearly demonstrate that the requirements of UDC Article 7.4.6.D.2.b are met. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
12/26/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
01/03/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | External Reviewers not required. No further action is required from the customer at this time. | ||
01/08/2025 | Fire New Construction | REVIEW COMPLETED | No Additional comments. | ||
01/02/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
01/03/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED |