Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.3
Permit Number - TD-DEV-0525-00144
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/26/2025 | NPPO Standard | APPROVED | |||
| 09/26/2025 | Site Landscape Standard | APPROVED | |||
| 09/19/2025 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TD-DEV-0525-00144 Location: 5 S HOUGHTON RD Review Date: 9/19/2025 Site Engineering Comments: 1. Show inlet Erosion protection for all basin inlets. Design Standards for stormwater Detention and Retention 5.3.1.8 2. Provide a descriptor box adjacent to each basin. Include a leader arrow to the basin or provide a label for the basin and reference the label on the top of the descriptor box. Ensure to include all information required by DSSDR 11.1.3.1 3. If Detention and/or Retention is provided, provide the following General Note, with the relevant volumes: “This project is required to provide stormwater detention and/or retention. The total volume of detention provided is _____________ cubic feet. The total volume of retention provided is ____________ cubic feet. DSSDR 11.2.2.1 4. Provide a dimensioned figure showing the trash enclosure maintains the required 10’x10’ clear space in compliance with TSM 8-01.0.0 If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 10/06/2025 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Krista Hansen – Lead Planner PDSD Zoning Review Section PROJECT: Mister Car Wash – SE Corner Broadway Blvd & Houghton Rd. Development Package (2nd Review) TD-DEV-0525-00144 TRANSMITTAL DATE: 10/6/2025 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 15, 2026. 1. COMMENT: 2-06.4.9.H.5.d – Previous Comment 11 was not fully addressed. Two long-term bicycle parking spaces are required (UDC Table 7.4.8-1). Show on plan and demonstrate the Design Criteria in UDC 7.4.9.D are met. If you have any questions about this transmittal, Contact Krista Hansen by email Krista.hansen@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Corrected development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |