Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW REVISION v.1
Permit Number - TD-DEV-0525-00143
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/04/2026 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 03/04/2026 | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| 03/04/2026 | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| 03/04/2026 | NPPO Standard | PENDING ASSIGNMENT | |||
| 03/04/2026 | OK to Submit - Engineering Fast | PENDING ASSIGNMENT | |||
| 03/04/2026 | OK to Submit - Zoning Fast | PENDING ASSIGNMENT | |||
| 03/04/2026 | ROW Engineering Review Standard | PENDING ASSIGNMENT | |||
| 03/04/2026 | Site Engineering Standard | PENDING ASSIGNMENT | |||
| 03/04/2026 | Site Landscape Standard | PENDING ASSIGNMENT | |||
| 03/04/2026 | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 03/04/2026 | CDRC Application Completeness Express | REQUIRES RESUBMIT | Revision submission to include: 1. Complete plan set consisting of last approved, stamped set with delta-clouded, changed, unstamped pages swapped in. If all pages are changed, ok to indicate that on narrative document. 2. Separate revision narrative document with page by page description of changes made. Please separate out the narrative document. |