Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.3
Permit Number - TD-DEV-0523-00249
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/14/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
11/14/2023 | Commercial Plumbing | REQUIRES RESUBMIT | The revised 6” sewer now has a section that is 106 feet long and a second section that is 163 feet long. Cleanouts shall be located at intervals of not more than 100-feet of developed pipe length: additional cleanouts are needed. [Second comment: The 6” sewer being replaced requires cleanout locations to be identified (CA5.2).] [Initial comment: Building sewers smaller than 8-inches shall have cleanouts located at intervals of not more than 100-feet of developed pipe length. Reference: Section 708.1.2, IPC 2018.] | ||
11/14/2023 | CDRC Application Completeness | REVIEW COMPLETED |