Permit Number: TD-DEV-0523-00249
Parcel: 12620001C

Address:
3400 E ZOO CT

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0523-00249
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/05/2023 External Reviewers - COT Parks & Recreation APPROVED Approved, we will review the building permit in more detail and request entry signage plans.
Tom
06/28/2023 CDRC Post Review PENDING ASSIGNMENT
06/28/2023 Commercial Plumbing REQUIRES RESUBMIT 1. An approved development plan is not to be used for construction or modification of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, etc.). Construction of the on-site utilities should be handled as a separate permit. From the portal for the DP, you will need to navigate to the “Sub-Records” tab. Under the Sub-Records tab you will use the “Private Utilities Permit” application type and walk through your steps as with any other application type.
2. Building sewers smaller than 8-inches shall have cleanouts located at intervals of not more than 100-feet of developed pipe length. Reference: Section 708.1.2, IPC 2018.
3. An approved 2-way cleanout fitting is allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning only in the direction of flow. Reference: Section 708.1.8, IPC 2018.
4. Determine the need for a backwater valve for each building per Section 714.1, IPC 2018, as amended by the City of Tucson.
06/22/2023 External Reviewers - Tucson Airport Authority REQUIRES RESUBMIT June 21, 2023
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-0523-00249, New Asia Exhibit, Reid Park Zoo / 3400 E Zoo Court, Tucson AZ
85716, Received May 23, 2023
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-0523-00249, the development plan for an
expansion of the existing zoo to establish a new Asia exhibit at 3400 E Zoo Court. This
development is located in the S.E. corner of the S.W. quarter of Section 16, Township 14S,
Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel number
126-20-001C, covers approximately 3.68 ± acres, and is zoned as Residence Zone 1 (R-1). The
nearest major roadway intersection is South Randolph Way and East 22nd Street, approximately
750 feet to the southeast of the subject development.
This site does lie within FAA Part 77 airspace.
The Tucson Airport is requiring a resubmit of this project. These conditions must be included in
the development plan document and shall be identified in the general notes section of all future
plans submitted to the City of Tucson for review.
Conditions of approval:
1. “According to the Federal Aviation Administration (FAA) Notice Criteria Tool, no Notice
Criteria are exceeded. Applicants are therefore not required to file FAA Form 7460.
However, if the use of cranes is anticipated during development and construction
activities, the applicant must file FAA Form 7460 at least 45 days in advance of such
use, to provide the applicant with sufficient time to respond to any concerns identified by
the FAA. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp.”
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
06/14/2023 NPPO REQUIRES RESUBMIT See Landscape comments.
06/22/2023 Site Engineering REQUIRES RESUBMIT Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview
The Stormwater Retention-Detention Manual can be found online at https://www.tucsonaz.gov/files/pdsd/updated-retention-detention-manual/updated-retention-detention-manual.pdf
TD-DEV-0523-00249
1. Provide the PC-Hydro output documents for the pre-development conditions.
2. Use of pumps in drainage design requires the approval of city engineering staff prior to review. Please review pump requirements in Section 4.18 in the Stormwater Retention-Detention Manual and contact Stephen Blood at stephen.blood@tucsonaz.gov to discuss requirements and approval.
3. Show proposed roof drainage for each building. Roof drainage may not be directed over sidewalks and must be either routed around sidewalks or under sidewalks through use of scuppers (TSM 7-01.4.3.D).
4. Storm lift station is denoted on plans as being in the civil plans but civil plans are not provided. Provide a detail for the storm lift station as well as the proposed path for its outlet.
5. Drainage from Area 2 is directed through a drainage swale to the south side of the main entrance, where there is no basin and no outlet. Clarify how stormwater would exit this area in case of an overflow.
6. In Area 3, drainage south of the tiger enclosures is directed into Area 2 and then back to a low spot in Area 3 with no outlet except to overflow onto the sidewalk. Show how this drainage will be directed under or around ADA accessible sidewalks to comply with TSM 7-01.4.3.D.
7. Drainage from the Event Meadow is directed southwest and over the sidewalk. Show how this drainage will be directed under or around ADA accessible sidewalks to comply with TSM 7-01.4.3.D.
8. Provide waste stream calculations as specified in Section 8-01.8 of the TSM.
9. Please provide a site plan for the proposed parking area.

Lianne Evans
lianne.evans@tucsonaz.gov
06/14/2023 Site Landscape REQUIRES RESUBMIT PROJECT: ASIA EXHIBIT – REID PARK ZOO
ACTIVITY NO. TD-DEV-0523-00249
ADDRESS/PARCEL: 3400 E ZOO CT
ZONING: R-1

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section and PAD-12 for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed.

UDC/TSM COMMENTS:
1. Ensure that Zoning, Engineering comments, and concerns are addressed prior to landscape section approval.
2. Due to the existing nature of the site as well as the proposed development by the zoo, NPPO/Commercial Rainwater Harvesting Plan Requirements are waived.
3. Provide the development package case number, TD-DEV-0523-00249, adjacent to the title block on all sheets. 2-06.4.3
4. Please include all required Landscape/Irrigation/Maintenance notes required as part of the submittal.
5. Pg HA1.4 shows an open space called ‘Event Meadow’ that is hybrid Bermuda grass sod, please grade this so it can be used as a micro basin for water harvesting, especially seeing as the City just instituted an ornamental turf ban. Landscape/NPPO understands this space has a function that is not purely ornamental. But any mitigation in terms of irrigation would be helpful.
6. Include a construction detail for trees planted near plazas/sidewalks/concrete paths. See Detail #402 here: https://www.tucsonaz.gov/tdot/landscape-architects


If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988
06/07/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Asia Exhibit – Reid Park Zoo
Development Package (1st Review)
TD-DEV-0523-00249

TRANSMITTAL DATE: June 7, 2023

DUE DATE: June 28, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is May 22, 2024.

2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS

1. COMMENT: 2-06.2.4 – The electrical plans submitted with the DP will not be reviewed for compliance with the 2017 National Electrical Code and will require a separate permit and review.

CONTENT REQUIREMENTS

2. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0523-00249, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

3. COMMENT: 2-06.4.7.A.2 - List the gross area of the site/subdivision by square footage and acreage.

2-06.4.7.A.8 - For development package documents provide:

4. COMMENT: 2-06.4.7.A.8.b – Provide a lot coverage calculation on the plan.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

5. COMMENT: 2-06.4.9.H.5 – The Fire Apparatus Access Lane width of 17’ near the Otter Exhibit does not meet the minimum 20’. A Board of Adjustment for Variance will be required.

6. COMMENT: 2-06.4.9.H.5 – Clearly demonstrate that the requirements of UDC Article 7.4.6.F.2.b are met from the Fire Apparatus Access Lane to the Chainlink AZA Fence & Wood Fence shown on the plan.

7. COMMENT: 2-06.4.9.H.5 – Along the Fire Apparatus Access Lane there are several areas that do not appear to meet the requirements of UDC Article 7.4.6.H.1

8. COMMENT: 2-06.4.9.H.5.a – Clarify why the square footage used in the vehicle parking space calculation is different than the what was shown on DP22-0261

9. COMMENT: 2-06.4.9.H.5.a – On the plan you state “NOTE; PARKING FOR THIS PROJECT PREVIOUSLY ADDRESSED THROUGH DP22-0261, NEW PARKING LOT, AND AN APPROVED CMO APPEAL FOR VEHCILE AND BICYCLE PARKING REQUIREMENTS, DATED 2/2/23, WHICH IS INCLUDED WITH THE PERMIT SUBMITTAL DOCUMENTS FOR THIS PROJECT.” You also state “A PARKING WAIVE RAPPLICATION SHALL BE SUBMITTED FOR THIS PROJECT.” Zoning was not able find the CMO Waive within your submittal, provide a copy with the next submittal. If the parking was approved during review of DP22-0261 why would a new waiver be required.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter.
05/22/2023 CDRC Application Completeness REVIEW COMPLETED
05/23/2023 CDRC Review Coordinator REVIEW COMPLETED Added external reviewers, sent emails and sent FYI emails per SOP.
06/26/2023 External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED Good Morning,
ADOT has no comments on this DEV.
Thank you for the opportunity to review.
05/23/2023 External Reviewers - Pima Association of Governments REVIEW COMPLETED Sent FYI emails per SOP.
05/23/2023 External Reviewers - Southwest Gas REVIEW COMPLETED Sent FYI emails per SOP.
05/23/2023 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Sent FYI emails per SOP.
05/23/2023 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED Sent FYI emails per SOP.
05/24/2023 Fire New Construction REVIEW COMPLETED
05/22/2023 OK to Submit - Engineering REVIEW COMPLETED
05/23/2023 OK to Submit - Landscape REVIEW COMPLETED
05/22/2023 OK to Submit - Zoning REVIEW COMPLETED
06/27/2023 Traffic Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
06/28/2023 Traffic Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov