Permit Review Detail
Review Status: Approved
Review Details: DEVELOPMENT PACKAGE NEW REVISION v.1
Permit Number - TD-DEV-0523-00249
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/04/2024 | Commercial Plumbing | APPROVED | |||
12/05/2024 | NPPO | APPROVED | |||
12/10/2024 | Site Zoning | APPROVED | |||
11/06/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
01/02/2025 | CDRC Post Review Express | REVIEW COMPLETED | |||
12/03/2024 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added TEP to the workflow. Review request email sent to TEP. | ||
01/02/2025 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | Hello, Tucson Electric Power Company (TEP) has conducted a thorough review of development plan TD-DEV-0523-00249 and would like to let you know that there are no objections to the proposed plan. It is important to note that any costs associated with the removal or relocation of existing TEP facilities will be billed to the developer. Should easements be necessary for any new TEP facilities, they will be acquired through a separate instrument. Thank you for taking the time to look into these matters. Best Regards, Sabrina Kyles Right of Way Agent II 520-891-2004 sabrina.Kyles@tep.com | ||
12/04/2024 | Fire New Construction | REVIEW COMPLETED | |||
11/15/2024 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
11/15/2024 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
12/04/2024 | ROW Engineering Review | REVIEW COMPLETED | |||
12/05/2024 | ROW Review | REVIEW COMPLETED | |||
12/05/2024 | Site Engineering | REVIEW COMPLETED | |||
12/05/2024 | Site Landscape | REVIEW COMPLETED | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA PDSD SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: REVISION 1 -NEW ASIA EXHIBIT, REID PARK ZOO ACTIVITY NO: TD-DEV-0523-00249 ADDRESS: 3400 E ZOO CT ZONING: R-1 RESIDENCE ZONE This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed. SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. After review of the approved landscape and irrigation plans, it appears that no conflicts exist between the revised underground utility locations and the proposed planting/irrigation layout. If conflicts arise during construction, them please identify the conflicts between the revised underground utility locations and the proposed plantings/irrigation layout. This can be reviewed and approved in an as built or record drawing at or near the completion of the project. If there are no conflicts, then the as built will not be required. If you have any questions about this comment, I can be reached at chad.keller@tucsonaz.gov or at 520.837.4923 |
||
12/12/2024 | TW New Development Review | REVIEW COMPLETED | TD-DEV-0523-00249 - Development Package NEW Revision v1 - 3400 E ZOO CT TUCSON Tucson Water has no objections to proposed Revision 1 of this development package. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |