Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0425-00113
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/01/2025 | Commercial Plumbing Standard | APPROVED | |||
| 05/07/2025 | NPPO Standard | APPROVED | |||
| 05/07/2025 | Site Landscape Standard | APPROVED | |||
| 05/08/2025 | Site Zoning Standard | APPROVED | |||
| 05/07/2025 | Site Engineering Standard | REQUIRES RESUBMIT | 1. Retaining wall design should be part of this Development Package, if not, a separate commercial wall permit will be required to be issued prior construction of walls. 2. Keynote 22 and the Grading Detail on sheet 7 don’t match the Detail F on sheet 11 that they refer to. Van spaces in angled parking require the access aisle to be located on the passenger side of the space. 3. Call out detectable warning strip adjacent to the curb in the PAG 207 Type 3 ramp. 4. Show accessible route from East parking aisle from sheet C3.0. 5. Place a note requiring bonding for all dog park fencing. Joshua Garcia joshua.garcia@tucsonaz.gov |
||
| 05/06/2025 | Building Official Standard | REVIEW COMPLETED | This project will require separate building permits for the restroom, pavilion and new light pole construction as well as a site utility permit for the new underground water, sewer, electrical lines and outdoor lighting. | ||
| 04/29/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 04/30/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 05/01/2025 | Historic Standard | REVIEW COMPLETED | Reviews by APHZAB and PRS have been completed. Decision Notice issued. No further historic review required at this time. Your decision letter for plan has been signed by the Planning & Development Services Director. Your sub-application is complete. Please upload the DL under SD-0924-00098 to your primary permit along with your most recent development package/design package materials. You will be instructed further if permit issuance is contingent on meeting any additional requirements. Contact Michael Taku at Michael.Taku@tucsonaz.gov |
||
| 05/01/2025 | MITZ District Standard | REVIEW COMPLETED | |||
| 05/01/2025 | ROW Engineering Review Standard | REVIEW COMPLETED |