Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0424-00131
Parcel: 108193210

Address:
765 E WETMORE RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0424-00131
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/25/2024 External Reviewers - Tucson Electric Power (TEP) APPROVED June 25, 2024
WO#T114083
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: New Development Package (Site) for FAA AutoCenter
TD-DEV-0424-00131
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 5/8/2024. There are existing facilities within the development which are
depicted upon the plan; however, there do not appear to be any apparent conflicts at
this time.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Chuck Leon
(520) 400-6133
cleon@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
06/13/2024 NPPO APPROVED
05/31/2024 External Reviewers - Pima County Addressing NOT REQUIRED Good morning,
This project does not require review by Pima County Addressing. The project address should be 765 E Wetmore RD without a building number. We previously issued Suite 191 at this address when it was a proposed shell building. I will retire Suite 191 so that what is left is just the plain address.
Nicholas Jordan
Site Review Project Manager – Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-9623
06/25/2024 CDRC Post Review Express PENDING ASSIGNMENT
05/29/2024 Commercial Plumbing REQUIRES RESUBMIT Provide a cleanout in the building sewer prior to entering the right-of-way. Reference: Pima County Standard Detail RWRD 401, 2021.
05/29/2024 Site Engineering REQUIRES RESUBMIT 1. The location of curbs around the new building is not clear. It appears that the sidewalk around the building is interrupted by a curb, and portions of the sidewalk are at the same elevation as the PAAL. Per UDC 7-01.4.2, Sidewalks associated with PAALs must be physically separated from any vehicular travel lane by means of curbing, separation (minimum six inches), barriers, railings, or other means, except at designated crosswalks.
2. Please provide dimensions for parking spaces including the placement of wheel stops within the spaces.
3. Please clearly identify all downspout locations from the roof of the new building.
4. Waste stream calculations are required per TSM Section 8. Please ensure that there is enough capacity in the existing shared waste enclosures to accommodate this additional waste.
5. Maximize water harvesting to all proposed landscaped areas by use of curb cuts and flush curbs. Show curb cuts on the site plan.

Mike Ortiz
michael.ortiz@tucsonaz.gov
06/13/2024 Site Landscape REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
PDSD SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: NEW DEVELOPMENT PACKAGE (SITE) FOR FAA AUTOCENTER
ACTIVITY NO: TD-DEV-0424-00131
ADDRESS/PARCEL: 765 E WETMORE RD/ 108193210
ZONING: C-3 COMMERCIAL ZONE

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed.
SITE LANDSCAPE/NPPO COMMENTS:

1. Ensure that Zoning, Engineering comments and concerns are addressed prior to landscape section approval.

2. Provide the development package case number, TD-DEV-0424-00131, adjacent to the title block on all sheets. 2-06.4.3

3. The NPPO requires an up to date aerial image for reference. For future reference, please add the aerial image of the site to your NPPO exception letter for our records.

4. Add downspouts and splash pads for drainage from the building.

5. Add water budget table to the CRWHP.

6. Show the WHIA areas on the CRWHP.

7. The subwatershed area should include drainage from the building. Modify the subwatershed areas and update the water budget table once it is added to your plans.

8. The subwatershed area should include the WHIA areas. Modify the subwatershed areas and update the water budget table once it is added to your plans.

9. The CRWHP should match the grading plan. Add spot elevation to the CRWHP that match the grading plan. Clearly reference the grading plan for rainwater harvesting basin construction.

10. If the above CRWHP comments are to extensive to add to the planting plan, then provide a separate CRWHP to the set for clarity.

11. The expansion of the property is significant. Is a street landscape border update required? I do see a couple of new proposed trees in the street landscape border area. If it is required, please add the required and provided plant material to the landscape plan.

12. Clearly indicate the point of connection/irrigation water meter on the irrigation plan. Match the symbol shown in the irrigation legend.


If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov
05/24/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: FAA AutoCenter
Development Package (1st Review)
TD-DEV-0424-00131

TRANSMITTAL DATE: May 24, 2024

DUE DATE: May 25, 2024

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is May 6, 2025.

2-06.3.0 FORMAT REQUIREMENTS

1. COMMENT: 2-06.3.9 – Sheet 4 does not meet the requirements of this standard.

2-06.4.0 CONTENT REQUIREMENTS

2. COMMENT: 2-06.4.1 - The name, mailing and email addresses, and phone number for the landscape architect on the right half of the cover sheet.

3. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0424-00131, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

4. COMMENT: 2-06.4.7.A.2 – The gross area of the site shall include the entire site.

5. COMMENT: 2-06.4.7.A.4 – General Note 4 clarify what type of Automotive use is proposed, major or minor.

6. COMMENT: 2-06.4.7.A.6.a – As 1st Ave. is designated as an Arterial on the COT MS&R Map provide a general note on the cover sheet stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R)

2-06.4.7.A.8 - For development package documents provide:

7. COMMENT: 2-06.4.7.A.8.c – Provide a building area expansion calculation on the plan.

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

8. COMMENT: 2-06.4.8.A - Provide site boundary perimeter information, including bearing in degrees, minutes, and seconds, together with distances in feet, to hundredths of a foot for the entire site.

9. COMMENT: 2-06.4.8.C – Provide the following information for 1st Ave, right-of-way width, and dimensioned width of paving, curbs, curb cuts, and sidewalks. Provide the following for Wetmore Rd, dimensioned width of paving, curbs, curb cuts, and sidewalks.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

10. COMMENT: 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined.

11. COMMENT: 2-06.4.9.H.5 – Remove the reference to PAAL from the north and east side of the building as these access lanes do not meet the definition of a PAAL.

12. COMMENT: 2-06.4.9.H.5.a – The required number of vehicle parking spaces shown for Building #3 and the total required for the development is not correct, see UDC Article 7.4.3.G.

13. COMMENT: 2-06.4.9.H.5.a – The handicapped space calculation shall include the number of van accessible space required and provided.

14. COMMENT: 2-06.4.9.H.5.c – The loading space calculation shall include the entire site.

15. COMMENT: 2-06.4.9.H.5.d – The short-term bicycle parking space calculation for Building #3 is not correct. Review UDC Table 7.4.8-I.

16. COMMENT: 2-06.4.9.H.5.d – The short-term bicycle parking space detail does not address UDC Article 7.4.9.F.2.a. Also, based on the 4.25’ wide dimension for the entire space and the requirements of UDC Article 7.4.9.B.2.f, this would make the proposed rack a total of 0.25 wide, clarify what type of rack you are using.

17. COMMENT: 2-06.4.9.H.5.d – Clearly show the location of the propose long-term bicycle parking on the plan and provide a detail that demonstrates that the requirements of UDC Article 7.4.9.D are met.

18. COMMENT: 2-06.4.9.Q – Provide the height and specific use proposed within the footprint of the building.

19. COMMENT: 2-06.4.9.R – Per TSM Section 7-01.4.1.B provide a sidewalk along the south side of the proposed building that meets the requirements of TSM Sections 7-04.4.2 & .3.

20. COMMENT: 2-06.4.9.R – Provide the widths for all proposed sidewalks on the plan.

21. COMMENT: 2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
04/18/2024 CDRC Application Completeness Express REVIEW COMPLETED
05/08/2024 CDRC Review Coordinator Express REVIEW COMPLETED Review request email sent per TEP and Addressing. CDRC sent FYI email to PAG, USPS, SWG.
05/08/2024 External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
05/08/2024 External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
05/08/2024 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
05/21/2024 Fire New Construction REVIEW COMPLETED
04/25/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
05/07/2024 OK to Submit - Landscape Fast REVIEW COMPLETED
04/25/2024 OK to Submit - Zoning Fast REVIEW COMPLETED
05/28/2024 ROW Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov