Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0424-00115
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/10/2024 | Commercial Plumbing | APPROVED | |||
04/15/2024 | OK to Submit - Landscape | APPROVED | |||
05/10/2024 | Site Engineering | APPROVED | |||
04/24/2024 | Site Zoning | APPROVED | |||
05/16/2024 | NPPO | NOT REQUIRED | Passed-Nicholas Martell | ||
05/16/2024 | Site Landscape | NOT REQUIRED | Passed-Nicholas Martell | ||
05/16/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
04/23/2024 | External Reviewers - Tucson Airport Authority | REQUIRES RESUBMIT | April 22, 2024 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0424-00115, We will be adding a shaded parking structure on the private airport side of the tarmac for K-9 vehicle parking for the airport police. / 7150 S Tucson Blvd, Tucson, AZ. 85756, Received April 15, 2024 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0224-00115, a development plan for constructing a new shaded parking structure on the private airport side of the tarmac for K-9 vehicle parking for the airport police at 7150 S Tucson Blvd. This development is located in the S.E. quarter of the S.W. quarter of Section 17, Township 15S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel number 140-42-074A, covers approximately 0.0207 ± acres, and is zoned as Mixed Use Zoning (MU). The nearest major roadway intersection is East Airport Drive and South Plumer Avenue, approximately 950 feet to the northwest of the subject development. The Tucson Airport Authority is requiring a resubmit of this project. Please update this submittal of the project to reflect the comments that the Tucson Airport Authority has provided. Tucson Airport Authority Comments: 1. Page 1 - Location map in upper left-hand corner of page one is incorrect. Sections 16 and 21 are being shown in the location map in error. Sections 18 and 20 are missing from the location map. Please correct this map accordingly since it appears to show it is representing Sections 17 – 20. 2. Page 1 – Permitting Notes – Note #2 – Please review the permitting authority for this project. The project is located within the jurisdiction of the City of Tucson and was annexed into the City of Tucson. 3. Page 2 – Grading Notes – Note #16 – This note references using Town of Oro Valley zoning code. Please correct this note to represent the appropriate zoning authority. 4. Overall comment – It appears that only uncovered parking spaces, with wheel stops, are being proposed. Please update plan set in the next submittal to represent shaded parking structure, which is referenced within the description of the project, unless it has been removed from the scope of work of the project. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning cc file Luis Quintero, Project Manager 1 |
||
04/05/2024 | CDRC Application Completeness | REVIEW COMPLETED | |||
04/15/2024 | CDRC Review Coordinator | REVIEW COMPLETED | Review request email sent per TAA. CDRC sent FYI email to PAG, USPS, SWG and TEP. | ||
04/15/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG and TEP. No further action is required from the customer at this time. | ||
04/15/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG and TEP. No further action is required from the customer at this time. | ||
04/15/2024 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG and TEP. No further action is required from the customer at this time. | ||
04/15/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG and TEP. No further action is required from the customer at this time. | ||
04/16/2024 | Fire New Construction | REVIEW COMPLETED | |||
04/10/2024 | OK to Submit - Engineering | REVIEW COMPLETED | |||
04/12/2024 | OK to Submit - Zoning | REVIEW COMPLETED | |||
05/08/2024 | ROW Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |