Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0424-00110
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/15/2024 | Commercial Plumbing | APPROVED | |||
05/21/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | May 21, 2024 WO#T114041 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: PROPOSED DEVELOPMENT OF A NEW CHASE BANK AND ASSOCIATED SITE IMPROVEMENTS TD-DEV-0424-00110 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 5/7/2024. There are existing facilities within the development which are depicted upon the plan; however, there do not appear to be any apparent conflicts at this time. Please note Docket 11762 Page 2134 to support underground segment line. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Andres Martinez (520) 349-0377 amartinez@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power | ||
05/29/2024 | NPPO | APPROVED | |||
05/29/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
05/08/2024 | ROW Engineering Review | REQUIRES RESUBMIT | TD-DEV-03424-00110 9190 E. Valencia Rd. Comments: 1. The new median of “Street A,” (Nexus Dr.) needs to extend to the pedestrian crossing between the new curb access ramps and a “Pedestrian Refuge” per P.A.G. standard 207 needs to be constructed. David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
||
05/13/2024 | Site Engineering | REQUIRES RESUBMIT | 1. Please provide an explanation on how the runoff from the project site will be directed to the Rita Ranch Regional Detention Basin. 2. Provide waste stream calculations compliant with TSM 8-01.8, please note which page the calculations are provided on in your comment response letter. Please note that although recycling service is not required, the site must provide capacity for recycling service- a single enclosure will not be sufficient, a double enclosure or two single enclosures will be required. 3. Show locations of roof downspouts. Stormwater from roof drains may not pass over ADA sidewalks per TSM 7-01.4.3D. Mike Ortiz michael.ortiz@tucsonaz.gov |
||
05/29/2024 | Site Landscape | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA PDSD SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: PROPOSED COMMERCIAL DEVELOPMENT – NEW CHASE BANK AND ASSOCIATED IMPROVEMENTS ACTIVITY NO: TD-DEV-0424-00110 ADDRESS/PARCEL: 9190 E VALENCIA RD/ 141390010 ZONING: C-2 COMMERCIAL ZONE This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed. COMMENTS: 1. Ensure that Zoning, Engineering comments and concerns are addressed prior to landscape section approval. 2. Provide the development package case number, TD-DEV-0424-00110, adjacent to the title block on all sheets. 2-06.4.3 3. If the site monitor can be identified at this time, please list their contact information on the NPPO. 4. Show and label sight visibility triangles at the entries to the site. 5. Please label irrigation meter as “irrigation only” on the irrigation plan and on the irrigation legend. See TSM 4-01.6.0 6. The existing to remain plant symbol for the barrel cacti is so light that it is hard to read. Darken the symbol on the plan and on the legend. 7. The barrel cacti transplant on site symbol is difficult to see on the plan. Change the symbol, or add a leader call out for the (2) transplants. 8. The dashed existing tree symbol is assumed to be the PIP palo verde. Make it clear on the plan and the legend that the palo verde is a PIP. 9. Update the 25-gallon and 95-gallon tree sizes with the equivalent box sizes. COMMERCIAL RAINWATER HARVESTING PLAN AND SITE WATER BUDGET TABLE COMMENTS: 10. WHIA B total catchment area square footage looks off from the stated 8,499 sf on the water budget table. WHIA B hatched in blue is 1,487 sf and the red dashed outline representing the catchment is shown graphically slightly larger than the WHIA. Look at the catchment area and adjust the numbers accordingly. 11. WHIA C is showing a similar situation to WHIA B. The WHIA area is 1,117 sf and the catchment area is 7,928 sf. The catchment is shown graphically as only marginally larger than the WHIA. Please adjust the numbers to reflect what is depicted graphically on the plan. Also, add the blue hatching to WHIA C for clarity and consistency. 12. Show all downspouts and splashpads for water coming off the roof of the building on the landscape and the commercial rainwater harvesting plan. If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov |
||
05/14/2024 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Chase Bank Valencia & Nexus Development Package (1st Review) TD-DEV-0424-00110 TRANSMITTAL DATE: May 14, 2024 DUE DATE: May 14, 2024 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is May 5, 2025. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.2.D – The page number and total number of pages on sheet 14 – 19 are not correct. 2. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0424-00110, adjacent to the title block on all sheets. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 3. COMMENT: 2-06.4.7.A.4 – The proposed use listed under General Note 3 is a Use Group not a use as classified in the UDC. Review UDC Table 4.8-4 and provide a use as designated in the UDC along with the applicable Use Specific Standards. 4. COMMENT: 2-06.4.7.A.6.a – As Valencia Rd is designated as an Arterial Gateway on the COT MS&R map revise General Note 14 to include UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R). 2-06.4.7.A.8 - For development package documents provide: 5. COMMENT: 2-06.4.7.A.8.b – Remove General Note 5 from the plan as FAR is not applicable on this site. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 6. COMMENT: 2-06.4.9.E – Final plat TD-DIV-01240-00001 will need to be approved and recorded prior to approval of this DP. 7. COMMENT: 2-06.4.9.H.5 – Demonstrate how the requirements of UDC Article 7.4.6.H.1 are met for the area called out under Keynote 24. 8. COMMENT: 2-06.4.9.H.5 – Demonstrate how the requirements of UDC Article 7.4.6.F.2.a.(2) are met for the proposed drive-through. 9. COMMENT: 2-06.4.9.H.5.a – The EV vehicle parking calculation is not correct. Per UDC Table 7.4.11-1 no EV spaces are required for a Financial Service: Excluding non-chartered institutions, use. 10. COMMENT: 2-06.4.9.H.5.a – Detail 2 sheet 9 the location dimension shown for the wheel stop is not correct. Review UDC Article 7.4.6.H.3 and provide the correct dimension. 11. COMMENT: 2-06.4.9.H.5.d – Provide a detail for the proposed short-term bicycle parking the clearly demonstrates how the requirements of UDC Articles 7.4.9.B.1, 7.4.9.B.2 and 7.4.9.C are met. 12. COMMENT: 2-06.4.9.H.5.d – Clearly show the location of the required long-term bicycle parking on the plan and provide a detail that clearly demonstrates how the requirements of UDC Articles 7.4.9.D are met. 13. COMMENT: 2-06.4.9.L – All cross access agreements and/or easement called out on the plan will need to be recorded prior to approval of this DP. Provide a copy of the recorded documents with the next submittal. 14. COMMENT: 2-06.4.9.Q – Provide the proposed height of the building within the footprint. 15. COMMENT: 2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Also, provide a note on the plan that all signs require separate permits. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
04/29/2024 | CDRC Application Completeness | REVIEW COMPLETED | |||
05/07/2024 | CDRC Review Coordinator | REVIEW COMPLETED | Review request email sent per Addressing and TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
05/07/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
05/15/2024 | External Reviewers - Pima County Addressing | REVIEW COMPLETED | Good afternoon, Pima County Addressing approves PROPOSED DEVELOPMENT OF A NEW CHASE BANK AND ASSOCIATED SITE IMPROVEMENTS / TD-DEV-0424-00110. The correct site address for this project is 9210 E Valencia RD. Nicholas Jordan Site Review Project Manager – Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
||
05/07/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
05/07/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
05/09/2024 | Fire New Construction | REVIEW COMPLETED | |||
05/06/2024 | OK to Submit - Zoning | REVIEW COMPLETED |