Permit Number: TD-DEV-0423-00197
Parcel: 137041120

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - TD-DEV-0423-00197
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/22/2024 Commercial Plumbing APPROVED
05/08/2024 NPPO APPROVED
04/19/2024 Site Engineering APPROVED
05/08/2024 Site Landscape APPROVED
05/08/2024 CDRC Post Review Express PENDING ASSIGNMENT
04/22/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL FROM: PDSD Zoning Review

PROJECT: Habitat For Humanity
Development Package (1st Review, 1st Revision)
TD-DIV-0423-00197

TRANSMITTAL DATE: April 22, 2024

DUE DATE: April 20, 2024

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is April 03, 2024.

1. COMMENT: - The revision letter provided states that there where changes to sheet 1 but no sheet 1 was provided in the revision set.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
04/05/2024 CDRC Application Completeness Express REVIEW COMPLETED
04/19/2024 CDRC Review Coordinator Express REVIEW COMPLETED External Reviewers not required. No further action is required from the customer at this time.
04/22/2024 Fire New Construction REVIEW COMPLETED
04/10/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
04/18/2024 OK to Submit - Landscape Fast REVIEW COMPLETED
04/12/2024 OK to Submit - Zoning Fast REVIEW COMPLETED
04/22/2024 ROW Engineering Review REVIEW COMPLETED No Comments