Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-0324-00089
Parcel: 13816001G

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.3

Permit Number - TD-DEV-0324-00089
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/07/2025 Site Engineering APPROVED
04/08/2025 Site Landscape APPROVED
04/08/2025 CDRC Post Review Express PENDING ASSIGNMENT
04/08/2025 NPPO REQUIRES RESUBMIT Site Landscape/NPPO Section Review Comments:

1. The NPPO Exception was not included with this submittal as stated in the response to comments letter. Attach the NPPO Waiver to the next submittal.

Thank you,
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
03/31/2025 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Circle K – Valencia & Nogales Hwy
Development Package (3rd Review)
TD-DEV-0324-00089

TRANSMITTAL DATE: March 31, 2025

DUE DATE: April 3, 2025

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is March 24, 2025.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

1. Until Entitlements review is approved Zoning cannot approve this DP. COMMENT: 2-06.4.7.A.3 – As the proposed diesel fueling stations are not shown on the Preliminary Development Plan, dated 9/12/12, a change of PDP may be required. Provide approved written documentation from the Entitlements Section that either a revised PDP is not required or that a revised PDP has been submitted and accepted. You can contact the Entitlements staff at 520-837-4968 or Tucsonrezoning@tucsonaz.gov.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.