Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0226-00048
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/27/2026 | NPPO Standard | APPROVED | |||
| 02/25/2026 | Site Engineering Standard | APPROVED | |||
| 02/27/2026 | Site Landscape Standard | APPROVED | PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: CIP-1025-00026-UPDATES TO AN EXISTING BIKE PARK TO INCLUDE NEW TRAILS, TRAIL FEATURES, AND SIGNAGE. PROJECT IS RUNNING ON AN ACCELERATED SCHEDULE TO REACTIVATE THE SITE. ACTIVITY NO: TD-DEV-0226-00048 ADDRESS: 2430 S SWAN RD ZONING: RESIDENCE ZONE (R-1) LAND USE: BIKE PARK 02.27.2026 THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING, PER-THE-CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM). RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED. SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. The overall plan set looks good and will be approved with this first submittal. Note: The development package appears to have a duplicate set attached. Please refer to Site Zoning comments for guidance and revise the DP as necessary for final Zoning approval. Thank you. Chad Keller, RLA Landscape Architect chad.keller@tucsonaz.gov 520.837.4923 |
||
| 02/25/2026 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL FROM: Bobby Parsons PDSD Zoning Review Section PROJECT: 100 Acre Wood Bike Park – 2430 S. Swan Rd. Tucson, AZ 85711 Development Package (1st Review) TD-DEV-0226-00048 TRANSMITTAL DATE: 2/25/2026 DUE DATE: 2/26/2025 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is February 24, 2027. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) CONTENT REQUIREMENTS 2-06.4.2 - The title block shall include the following information and be provided on each sheet: 2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet xx of xx). 1. COMMENT: 2-06.4.2.D – The sheet index refers to 28 pages however the submittal includes 45 pages. Please ensure the sheet index, total number of pages, and page x of xx match. ***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations *** If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf. |
||
| 02/24/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 02/25/2026 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 03/03/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 02/25/2026 | ROW Engineering Review Standard | REVIEW COMPLETED |