Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0125-00030
Parcel: 124181920

Address:
998 S CHERRY AV

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0125-00030
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/28/2025 Commercial Plumbing Standard APPROVED
03/06/2025 NPPO Standard NOT REQUIRED
03/06/2025 Site Landscape Standard NOT REQUIRED
03/10/2025 CDRC Post Review Express PENDING ASSIGNMENT
03/10/2025 Site Engineering Standard REQUIRES RESUBMIT 1. See that zoning comments are addressed.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
03/03/2025 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Canary Systems – Covered Parking Structure w/Solar
Development Package (1st Review)
TD-DEV-0125-00030

TRANSMITTAL DATE: March 3, 2025

DUE DATE: February 28, 2025

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is February 05, 2026.

2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS

1. COMMENT: 2-06.2.4 – Remove all references to the building codes from this plan as this plan is for site related reviews only.

2-06.4.0 CONTENT REQUIREMENTS

2. COMMENT: 2-06.4.1 - The name, mailing and email addresses, and phone number of the primary property owner of the site shall be provided on the right half of the cover sheet.

3. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0125-00030, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

4. COMMENT: 2-06.4.7.A.4 - Provide a general note the identifies the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

5. COMMENT: 2-06.4.7.A.6.a - As Kino Pw. is designated as an Arterial and Warehouse Ave. & Cherry Ave. are designated as Collectors on the COT MS&R Map provide a general note on the cover sheet stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R) & UDC ARTICLE 5.5 GATEWAY CORRIFOR ZONE (GCR)”

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

6. COMMENT: 2-06.4.8.C – Provide the following for Warehouse Ave. and 20th St., dimensioned width of paving, curbs, curb cuts, and sidewalk, as applicable.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

7. COMMENT: 2-06.4.9.Q – The maximum building height 40’ listed under Code Review is not correct. Per UDC Table 6.3-5.A the maximum building height in the I-1 zone is 75’.

Additional Comments

8. COMMENT: – Clarify what the 100’ dashed line shown on the site plan is for.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
01/30/2025 CDRC Application Completeness Express REVIEW COMPLETED
02/06/2025 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added TEP to the workflow. Review request email sent to TEP.
02/27/2025 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED February 27, 2025
WO#T141490
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Canary Systems PV System
TD-DEV-0125-00030
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 2/6/2025. There arepossible conflicts with an existing pole line within the
development. Contact TEP Design if relocation is required (contact information below).
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Salazar
(520) 305-6713
msalazar@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
02/06/2025 Fire New Construction Standard REVIEW COMPLETED System shall comply with the 2024 IFC Section 1205: Solar photo voltaic power Systems.
02/06/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
02/06/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
02/14/2025 ROW Engineering Review Standard REVIEW COMPLETED
02/10/2025 ROW Review REVIEW COMPLETED