Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW REVISION v.2
Permit Number - TD-DEV-0125-00006
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/25/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0125-00006 (1st Review REV 1) Project: New Valvoline - minor auto service building Location: 10096 E OLD VAIL RD Review Date: 2/25/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering *This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. * City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Review Comments: 1. The pathway shown connecting to the revised trash enclosure towards the south will need to be revised to be compliant with TSM 7-01.4.1.F a. The reason being that now with this revision, a pedestrian would essentially be walking behind a vehicle which is against TSM 7-01.4.1.F b. Simple solution could be to simply connect to the existing striped area next to the enclosure itself 2. As the two buildings proposed exists and functions on the same “Site,” demonstrate how this new building will connect to the rest of the site per TSM 7-01.3.0 3. The two-way PAAL that runs adjacent to the future building (south side of building) requires a minimum of 24’ (per UDC Table 7.4.6-2). Revise site plan to meet requirement. If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov |
||
| 03/11/2026 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Krista Hansen – Lead Planner PDSD Zoning Review Section PROJECT: 10096 E OLD VAIL RD, PAD-36 Development Package (Revision 1) TD-DEV-0125-00006 TRANSMITTAL DATE: 3/11/2026 Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is February 20, 2027. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 01. COMMENT: The two-way PAAL that runs adjacent to the future building (south side of building) requires a minimum of 24’ (per UDC Table 7.4.6-2). Adjust site plan to meet requirement. 02. COMMENT: Please see Site Engineering Comments regarding pedestrian circulation and the revised trash enclosure. Modify pathway alignment. For questions regarding Zoning comments, please contact me at: Krista.Hansen@tucsonaz.gov |
||
| 02/20/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 02/25/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | NO EXTERNAL REVIEWERS External Reviewers not required. No further action is required from the customer at this time Site Zoning, Engineering, Water, Entitlements, Commercial Plumbing. |
||
| 03/09/2026 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 03/10/2026 | New Services/JOC Standard | REVIEW COMPLETED | |||
| 02/23/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 02/24/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED |