Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0124-00013
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/29/2024 | Commercial Plumbing | APPROVED | |||
| 02/27/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | Greetings, The plat is conditionally approved. Existing TEP facilities within the development need to be depicted in the plan [Dk. 3399 Pg. 42; Dk. 965 Pg 551; Dk. 5277 Pg. 272]. There are possible conflicts, including existing facilities, and verification will be required to confirm this will not conflict with existing facilities. In addition, TEP facilities are not depicted in the plans. Please call the New Construction Department at 520-918-8300 to apply for service for new development. Submit a final set of approved plans, including electrical load and offsite improvement plans, to determine how TEP will serve this development. If easements are required for new TEP facilities, they will be obtained by separate instrument. Respectfully, Tucson Electric Power Co. Land Resources Department |
||
| 02/23/2024 | ROW Engineering Review | APPROVED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
||
| 02/23/2024 | NPPO | NOT REQUIRED | |||
| 02/23/2024 | Site Landscape | NOT REQUIRED | |||
| 02/29/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 02/23/2024 | Site Engineering | REQUIRES RESUBMIT | Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview 1. Show the one-foot setback required between the PAAL and the open structure on the site plan (UDC 7.4.6.F.2.a(1)). Lianne Evans lianne.evans@tucsonaz.gov |
||
| 01/31/2024 | Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Wyatt Berger Lead Planner PROJECT: Tucson Symphony Orchestra PV System Development Package (1st Review) TD-DEV-0124-00013 TRANSMITTAL DATE: January 31, 2024 DUE DATE: February 24, 2024 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM). Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is January 31, 2025. 1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0124-00013, adjacent to the title block on all sheets. 2. COMMENT: 2-06.4.7.A.2 – Provide a copy of an approved lot consolidation request from the Pima County Assessor’s Office. 3. COMMENT: 2-06.4.7.A.4 – The existing use stated on the cover sheet is not a UDC-defined use and should be listed as Entertainment, subject to use-specific standards 4.9.4.K.1, .2, .3, .4, 4.9.4.C.3, 4.9.13.E, and 4.9.13.P. 4. COMMENT: 2-06.4.7.A.6 – Add a general note on the cover sheet stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE CRITERIA OF UDC SEC. 5.4, MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R).” 5. COMMENT: 2-06.4.8.B – Ensure all existing easements with recordation information, width, and purpose, are notated on the site plan. 6. COMMENT: 2-06.4.9.F - Indicate the zoning classification to the west across 7th Avenue. 7. COMMENT: 2-06.4.9.H.5 – Show the one-foot setback required between the PAAL and the open structure on the site plan (UDC 7.4.6.F.2.a(1)). If you have any questions about this review, please contact me at Wyatt.Berger@tucsonaz.gov or at (520) 837-4951. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 01/17/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 01/26/2024 | CDRC Review Coordinator Express | REVIEW COMPLETED | Review request email sent per ADOT & TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
| 02/07/2024 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | Good Afternoon, ADOT has no comments on this DEV. Thank you for the opportunity to review. | ||
| 01/26/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
| 01/26/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
| 01/26/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
| 02/09/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 01/24/2024 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 01/19/2024 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 01/24/2024 | OK to Submit - Zoning Fast | REVIEW COMPLETED |